IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

104,815

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0129 # 04 Y:1999 04 1999 RECOVER WASTE HEAT FROM EQUIPMENT $24,159 $17,000 Not Implemented
UM0129 # 05 Y:1999 05 1999 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $56,391 $122,400 Not Implemented
UM0129 # 06 Y:1999 06 1999 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $3,463 $19,860 Not Implemented
UF0216 # 01 Y:1999 01 1999 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $50,699 $251,200 Not Implemented
UF0216 # 02 Y:1999 02 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $11,441 $0 Not Implemented
UF0216 # 03 Y:1999 03 1999 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $6,211 $0 Implemented
UF0216 # 04 Y:1999 04 1999 RECOVER AND REUSE WASTE MATERIAL $11,243 $1,800 Not Implemented
UF0216 # 05 Y:1999 05 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $5,200 $0 Not Implemented
UF0216 # 06 Y:1999 06 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,365 $0 Implemented
AM0338 # 01 Y:1999 01 1999 PAY UTILITY BILLS ON TIME $20,800 $0 Implemented
AM0338 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,000 $500 Implemented
AM0338 # 03 Y:1999 03 1999 CONVERT TO AQUEOUS CLEANING SYSTEM $10,320 $10,300 Implemented
AM0338 # 04 Y:1999 04 1999 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $8,800 $900 Not Implemented
AM0338 # 05 Y:1999 05 1999 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,985 $2,435 Implemented
AM0338 # 06 Y:1999 06 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,000 $350 Implemented
AM0338 # 07 Y:1999 07 1999 INSTALL SKYLIGHTS $1,525 $410 Implemented
AM0338 # 08 Y:1999 08 1999 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $2,650 $0 Implemented
AM0338 # 09 Y:1999 09 1999 INSTALL SKYLIGHTS $-1,410 $2,230 Not Implemented
AM0338 # 10 Y:1999 10 1999 INSTALL SKYLIGHTS $370 $470 Not Implemented
AM0338 # 11 Y:1999 11 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $300 $0 Not Implemented
TN0649 # 01 Y:1999 01 1999 MODIFY CURRENT INCENTIVE PROGRAM $15,000 $16,370 Not Implemented
TN0649 # 02 Y:1999 02 1999 MAINTAIN MACHINES TO REDUCE LEAKS $9,350 $6,920 Not Implemented
TN0649 # 03 Y:1999 03 1999 RECOVER AND REUSE WASTE MATERIAL $8,380 $15,300 Not Implemented
TN0649 # 04 Y:1999 04 1999 REPAIR OR REPLACE STEAM TRAPS $5,140 $0 Not Implemented
TN0649 # 05 Y:1999 05 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,500 $2,830 Not Implemented