Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,500
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0313 # 05 Y:2005 | 05 | 2005 | REPAIR AND ELIMINATE STEAM LEAKS | $15,992 | $3,200 | Implemented |
WV0313 # 06 Y:2005 | 06 | 2005 | MINIMIZE WATER USAGE | $14,331 | $13,600 | Not Implemented |
WV0313 # 07 Y:2005 | 07 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,376 | $900 | Implemented |
WV0313 # 08 Y:2005 | 08 | 2005 | INSULATE BARE EQUIPMENT | $4,952 | $1,322 | Implemented |
WV0313 # 09 Y:2005 | 09 | 2005 | DEVELOP A REPAIR/REPLACE POLICY | $3,756 | $1,320 | Implemented |
WV0313 # 10 Y:2005 | 10 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,479 | $110 | Implemented |
WV0313 # 11 Y:2005 | 11 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,420 | $1,000 | Implemented |
WV0313 # 12 Y:2005 | 12 | 2005 | USE SYNTHETIC LUBRICANT | $2,220 | $620 | Implemented |
WV0313 # 13 Y:2005 | 13 | 2005 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $2,101 | $0 | Not Implemented |
WV0313 # 14 Y:2005 | 14 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,447 | $1,050 | Not Implemented |
WV0312 # 01 Y:2005 | 01 | 2005 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $15,023 | $6,435 | Not Implemented |
WV0312 # 02 Y:2005 | 02 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,049 | $18,750 | Implemented |
WV0312 # 03 Y:2005 | 03 | 2005 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $14,013 | $9,600 | Not Implemented |
WV0312 # 04 Y:2005 | 04 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,107 | $2,970 | Implemented |
WV0312 # 05 Y:2005 | 05 | 2005 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $5,641 | $7,480 | Not Implemented |
WV0312 # 06 Y:2005 | 06 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,708 | $250 | Implemented |
WV0312 # 07 Y:2005 | 07 | 2005 | DEVELOP A REPAIR/REPLACE POLICY | $3,672 | $413 | Not Implemented |
WV0312 # 08 Y:2005 | 08 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,210 | $4,800 | Implemented |
WV0312 # 09 Y:2005 | 09 | 2005 | INSTALL OCCUPANCY SENSORS | $1,797 | $2,788 | Implemented |
WV0312 # 10 Y:2005 | 10 | 2005 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $1,712 | $824 | Not Implemented |
WV0312 # 11 Y:2005 | 11 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,460 | $0 | Implemented |
WV0312 # 12 Y:2005 | 12 | 2005 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $706 | $120 | Implemented |
WV0312 # 13 Y:2005 | 13 | 2005 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $591 | $130 | Not Implemented |
NC0306 # 01 Y:2004 | 01 | 2004 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $96,975 | $360,700 | Not Implemented |
NC0306 # 02 Y:2004 | 02 | 2004 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $86,931 | $100,000 | n/a |