IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,043

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0867 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,837 $21,300 Implemented
OK0867 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,294 $2,444 Not Implemented
OK0867 # 06 Y:2013 06 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,712 $500 Implemented
OK0867 # 07 Y:2013 07 2013 RECOVER WASTE HEAT FROM EQUIPMENT $747 $1,909 Not Implemented
OK0867 # 08 Y:2013 08 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $346 $701 Implemented
OK0867 # 09 Y:2013 09 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,228 $4,333 Not Implemented
OK0867 # 10 Y:2013 10 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $74 $0 Not Implemented
OK0867 # 11 Y:2013 11 2013 INSULATE BARE EQUIPMENT $15 $44 Implemented
OR0615 # 01 Y:2013 01 2013 ELIMINATE SHUTDOWNS OF CONTROLS DUE TO OVERHEATING $24,283 $1,000 Implemented
OR0615 # 02 Y:2013 02 2013 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $48,896 $68,866 Implemented
OR0615 # 03 Y:2013 03 2013 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $791,616 $300,000 Not Implemented
OR0615 # 04 Y:2013 04 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $9,731 $17,127 Implemented
OR0615 # 05 Y:2013 05 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $14,352 $36,600 Not Implemented
OR0615 # 06 Y:2013 06 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,601 $4,986 Implemented
OR0616 # 01 Y:2013 01 2013 INSTALL SENSORS TO DETECT DEFECTS $145,630 $200 Implemented
OR0616 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,132 $6,100 Implemented
OR0616 # 03 Y:2013 03 2013 OPTIMIZE PLANT POWER FACTOR $2,727 $11,025 Not Implemented
OR0616 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $645 $750 Implemented
OR0614 # 01 Y:2013 01 2013 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $31,637 $42,000 Not Implemented
OR0614 # 02 Y:2013 02 2013 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $16,101 $10,000 Implemented
OR0614 # 03 Y:2013 03 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,327 $0 Implemented
OR0614 # 04 Y:2013 04 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,554 $1,828 Not Implemented
OR0614 # 05 Y:2013 05 2013 INSULATE BARE EQUIPMENT $667 $446 Not Implemented
BS0019 # 01 Y:2013 01 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $187 $364 Not Implemented
BS0019 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $342 $349 Implemented