IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,703

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0664 # 04 Y:2014 04 2014 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $7,770 $1,200 Implemented
AM0664 # 05 Y:2014 05 2014 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT $5,260 $0 Implemented
AM0664 # 06 Y:2014 06 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,970 $4,550 Implemented
AM0664 # 07 Y:2014 07 2014 INSTALL OCCUPANCY SENSORS $625 $870 Implemented
UD0911 # 01 Y:2014 01 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,544 $0 Implemented
UD0911 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,620 $1,000 Implemented
UD0911 # 03 Y:2014 03 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,866 $8,000 Not Implemented
UD0911 # 04 Y:2014 04 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,693 $0 Not Implemented
UD0911 # 05 Y:2014 05 2014 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $14,978 $20,079 Implemented
UD0911 # 06 Y:2014 06 2014 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $74,000 $124,534 Implemented
UD0911 # 07 Y:2014 07 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $18,375 $7,000 Not Implemented
UD0911 # 08 Y:2014 08 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,256 $47,188 Implemented
UD0911 # 09 Y:2014 09 2014 USE PHOTOCELL CONTROLS $732 $1,440 Not Implemented
UD0911 # 10 Y:2014 10 2014 USE DECANTING, FLOTATION TO REMOVE CONTAMINANTS $262,802 $80,000 Not Implemented
UK1404 # 01 Y:2014 01 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $297 $0 Implemented
UK1404 # 02 Y:2014 02 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $235 $500 Not Implemented
UK1404 # 03 Y:2014 03 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $434 $300 Not Implemented
UK1404 # 04 Y:2014 04 2014 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $300 $1,700 Not Implemented
UK1404 # 05 Y:2014 05 2014 SELL / OFFER BY-PRODUCT AS ANIMAL FEED $1,300 $2,500 Implemented
UK1404 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $359 $266 Not Implemented
UK1404 # 07 Y:2014 07 2014 ADD AREA LIGHTING SWITCHES $331 $221 Not Implemented
UK1404 # 08 Y:2014 08 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $74 $17 Not Implemented
UK1404 # 09 Y:2014 09 2014 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $162 $0 Implemented
SU0368 # 01 Y:2014 01 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,372 $0 Not Implemented
SU0368 # 02 Y:2014 02 2014 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $11,558 $0 Not Implemented