IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,737

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0140 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,952 $4,513 Implemented
BS0140 # 02 Y:2020 02 2020 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $466 $319 Implemented
BS0140 # 03 Y:2020 03 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,058 $0 Implemented
BS0140 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,837 $642 Implemented
BS0140 # 05 Y:2020 05 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,475 $2,808 Not Implemented
BS0140 # 06 Y:2020 06 2020 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $479 $1,149 Not Implemented
WV0595 # 01 Y:2020 01 2020 USE DEMAND CONTROLLER OR LOAD SHEDDER $7,138 $5,700 Not Implemented
WV0595 # 02 Y:2020 02 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,478 $12,144 Not Implemented
WV0595 # 03 Y:2020 03 2020 INSULATE BARE EQUIPMENT $1,313 $6,099 Implemented
WV0595 # 04 Y:2020 04 2020 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,299 $4,225 Not Implemented
WV0595 # 05 Y:2020 05 2020 INSTALL OCCUPANCY SENSORS $1,263 $3,355 Implemented
WV0595 # 06 Y:2020 06 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $650 $1,100 Implemented
WV0595 # 07 Y:2020 07 2020 DEVELOP A REPAIR/REPLACE POLICY $315 $406 Implemented
WV0595 # 08 Y:2020 08 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $188 $305 Implemented
WV0595 # 09 Y:2020 09 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $119 $85 Implemented
AS0489 # 01 Y:2020 01 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,774 $11,876 Not Implemented
AS0489 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,308 $21,823 Not Implemented
AS0489 # 03 Y:2020 03 2020 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,899 $28,466 Not Implemented
AS0489 # 04 Y:2020 04 2020 INSTALL OCCUPANCY SENSORS $6,004 $7,027 Not Implemented
AS0489 # 05 Y:2020 05 2020 REDUCE HEAT GAIN BY WINDOW TINTING $5,105 $19,291 Not Implemented
AS0489 # 06 Y:2020 06 2020 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,216 $30 Not Implemented
AS0489 # 07 Y:2020 07 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $805 $135 Not Implemented
AS0489 # 08 Y:2020 08 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $675 $122 Implemented
AS0489 # 09 Y:2020 09 2020 UPGRADE CONTROLS ON COMPRESSORS $106 $394 Not Implemented
BS0139 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $944 $2,630 Implemented