IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,295

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0511 # 05 Y:2021 05 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $289 $1,000 Not Implemented
LE0511 # 06 Y:2021 06 2021 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,092 $12,000 Not Implemented
LE0511 # 07 Y:2021 07 2021 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $1,243 $6,000 Not Implemented
MZ0310 # 01 Y:2021 01 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $6,274 $490 Not Implemented
MZ0310 # 02 Y:2021 02 2021 BASE UTILITY CHARGES ON USAGE RATHER THAN AREA OCCUPIED $3,630 $1,160 Not Implemented
MZ0310 # 03 Y:2021 03 2021 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,250 $2,580 Not Implemented
MZ0310 # 04 Y:2021 04 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,165 $1,896 Not Implemented
LS2111 # 01 Y:2021 01 2021 INSTALL TIMERS AND/OR THERMOSTATS $1,141 $75 Implemented
LS2111 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,953 $225 Implemented
LS2111 # 03 Y:2021 03 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,413 $675 Not Implemented
LS2111 # 04 Y:2021 04 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $118 $102 Implemented
LS2111 # 05 Y:2021 05 2021 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $263 $240 Not Implemented
LS2111 # 06 Y:2021 06 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $201 $540 Implemented
NC0665 # 01 Y:2021 01 2021 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,027 $0 n/a
NC0665 # 02 Y:2021 02 2021 RECOVER WASTE HEAT FROM EQUIPMENT $1,072 $1,000 n/a
NC0665 # 03 Y:2021 03 2021 RECOVER WASTE HEAT FROM EQUIPMENT $5,642 $2,000 n/a
AM0826 # 01 Y:2021 01 2021 MINIMIZE WATER USAGE $31,800 $136,000 Implemented
AM0826 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,325 $5,710 Implemented
AM0826 # 03 Y:2021 03 2021 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $2,540 $4,310 Not Implemented
AM0826 # 04 Y:2021 04 2021 INSTALL OCCUPANCY SENSORS $1,630 $640 Not Implemented
CL2110 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,493 $18,147 n/a
CL2110 # 02 Y:2021 02 2021 INSTALL OCCUPANCY SENSORS $5,721 $4,908 n/a
CL2110 # 03 Y:2021 03 2021 USE PHOTOCELL CONTROLS $295 $60 n/a
CL2110 # 04 Y:2021 04 2021 INSTALL TIMERS AND/OR THERMOSTATS $607 $0 n/a
CL2110 # 05 Y:2021 05 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,104 $0 n/a