IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,713

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0374 # 01 Y:2020 01 2020 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $23,161 $320 Not Implemented
MI0374 # 02 Y:2020 02 2020 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $7,650 $4,760 Not Implemented
MI0374 # 03 Y:2020 03 2020 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,237 $480 Not Implemented
MI0374 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,360 $1,980 Not Implemented
MI0374 # 05 Y:2020 05 2020 INSTALL OCCUPANCY SENSORS $2,170 $1,356 Not Implemented
MI0374 # 06 Y:2020 06 2020 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $2,000 $160 Not Implemented
MI0374 # 07 Y:2020 07 2020 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,446 $1,238 Not Implemented
MI0374 # 08 Y:2020 08 2020 USE COMPRESSOR AIR FILTERS $571 $562 Not Implemented
MI0373 # 01 Y:2020 01 2020 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $8,619 $1,840 Implemented
MI0373 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,444 $25,685 Implemented
MI0373 # 03 Y:2020 03 2020 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $5,501 $16,518 Not Implemented
MI0373 # 04 Y:2020 04 2020 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $3,395 $1,470 Implemented
MI0373 # 05 Y:2020 05 2020 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,315 $27,047 Not Implemented
MI0373 # 06 Y:2020 06 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,264 $1,980 Implemented
MI0373 # 07 Y:2020 07 2020 INSTALL OCCUPANCY SENSORS $176 $480 Implemented
UF0551 # 01 Y:2020 01 2020 Install Anaerobic Digester $1,032,365 $4,965,000 Implemented
UF0551 # 02 Y:2020 02 2020 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $537,853 $1,400,000 Implemented
UF0551 # 03 Y:2020 03 2020 RECOVER WASTE HEAT FROM EQUIPMENT $62,520 $30,000 Implemented
UF0551 # 04 Y:2020 04 2020 INSTALL TURBULATORS $18,151 $7,500 Not Implemented
UF0551 # 05 Y:2020 05 2020 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $14,189 $1,500 Implemented
UF0551 # 06 Y:2020 06 2020 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,254 $4,938 Implemented
UF0551 # 07 Y:2020 07 2020 INSTALL / REPAIR INSULATION ON STEAM LINES $2,687 $1,936 Implemented
UF0551 # 08 Y:2020 08 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,166 $0 Implemented
MI0372 # 02 Y:2020 02 2020 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $5,241 $20,434 Not Implemented
MI0372 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,282 $1,980 Implemented