Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,872
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
ND0313 # 09 Y:1998 | 09 | 1998 | DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS | $976 | $250 | n/a |
OK0557 # 01 Y:1998 | 01 | 1998 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $956 | $2,140 | Implemented |
OK0557 # 02 Y:1998 | 02 | 1998 | USE POWER DURING OFF-PEAK PERIODS | $15,633 | $0 | Implemented |
OK0557 # 03 Y:1998 | 03 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $715 | $250 | Implemented |
OK0557 # 04 Y:1998 | 04 | 1998 | PAY UTILITY BILLS ON TIME | $656 | $0 | Implemented |
OK0557 # 05 Y:1998 | 05 | 1998 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $20,969 | $50,000 | Implemented |
OK0557 # 06 Y:1998 | 06 | 1998 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $41,600 | $260,000 | Not Implemented |
OR0329 # 01 Y:1998 | 01 | 1998 | MODIFY CURRENT INCENTIVE PROGRAM | $21,200 | $22,600 | Not Implemented |
OR0329 # 02 Y:1998 | 02 | 1998 | DEVELOP STANDARD OPERATING PROCEDURES | $1,950 | $1,140 | Implemented |
OR0329 # 03 Y:1998 | 03 | 1998 | UPGRADE CONTROLS ON COMPRESSORS | $2,982 | $1,000 | Not Implemented |
OR0329 # 04 Y:1998 | 04 | 1998 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $22,670 | $239,200 | Not Implemented |
OK0556 # 01 Y:1998 | 01 | 1998 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $75,726 | $9,000 | Implemented |
OK0556 # 02 Y:1998 | 02 | 1998 | INSTALL / REPAIR INSULATION ON STEAM LINES | $227 | $678 | Implemented |
OK0556 # 03 Y:1998 | 03 | 1998 | REPAIR AND ELIMINATE STEAM LEAKS | $1,303 | $500 | Implemented |
OK0556 # 04 Y:1998 | 04 | 1998 | METER WASTE WATER | $119,889 | $0 | Not Implemented |
OK0556 # 05 Y:1998 | 05 | 1998 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,048 | $3,000 | Not Implemented |
OK0556 # 06 Y:1998 | 06 | 1998 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $633 | $1,020 | Implemented |
OK0556 # 07 Y:1998 | 07 | 1998 | INSTALL SOLID WASTE INCINERATOR FOR HEAT | $1,000 | $0 | Implemented |
NC0151 # 01 Y:1998 | 01 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,157 | $600 | Not Implemented |
NC0151 # 02 Y:1998 | 02 | 1998 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $33,411 | $132,700 | Not Implemented |
NC0151 # 03 Y:1998 | 03 | 1998 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $401 | $1,500 | Not Implemented |
NC0151 # 04 Y:1998 | 04 | 1998 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $700 | $2,100 | Not Implemented |
NC0151 # 05 Y:1998 | 05 | 1998 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $5,290 | $3,000 | Not Implemented |
NC0151 # 06 Y:1998 | 06 | 1998 | UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID | $3,822 | $15,000 | Not Implemented |
NC0151 # 07 Y:1998 | 07 | 1998 | USE ADSORPTION, ION EXCHANGE TO REMOVE CONTAMINANTS | $11,500 | $45,000 | Not Implemented |