IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,105

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TA0063 # 04 Y:2003 04 2003 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $18,000 $11,210 Implemented
TA0063 # 05 Y:2003 05 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,730 $17 Implemented
TA0063 # 06 Y:2003 06 2003 INSTALL OCCUPANCY SENSORS $560 $170 Not Implemented
TA0063 # 07 Y:2003 07 2003 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $400 $0 Not Implemented
TA0063 # 08 Y:2003 08 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $140 $270 Implemented
SF0267 # 01 Y:2003 01 2003 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $7,672 $0 Implemented
SF0267 # 02 Y:2003 02 2003 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $2,510 $0 Implemented
SF0267 # 03 Y:2003 03 2003 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $12,968 $3,164 Not Implemented
SF0267 # 04 Y:2003 04 2003 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,638 $877 Not Implemented
SF0267 # 05 Y:2003 05 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,641 $10,047 Not Implemented
SF0267 # 06 Y:2003 06 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $39,106 $0 Implemented
SF0267 # 07 Y:2003 07 2003 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $3,821 $3,895 Implemented
SF0267 # 08 Y:2003 08 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $51,465 $60,181 Not Implemented
SF0267 # 09 Y:2003 09 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,206 $3,741 Implemented
SF0267 # 10 Y:2003 10 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,536 $38,576 Not Implemented
SF0267 # 11 Y:2003 11 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,587 $34,108 Not Implemented
SF0267 # 12 Y:2003 12 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,463 $14,493 Implemented
SF0267 # 13 Y:2003 13 2003 INSTALL OCCUPANCY SENSORS $934 $4,585 Not Implemented
SF0267 # 14 Y:2003 14 2003 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $3,500 $0 Implemented
SF0267 # 15 Y:2003 15 2003 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $15,500 $9,900 Implemented
SF0267 # 16 Y:2003 16 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $4,500 $18,000 Implemented
UD0681 # 01 Y:2003 01 2003 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $82,000 $1,490 Implemented
UD0681 # 02 Y:2003 02 2003 MAKE ICE DURING OFF PEAK HOURS FOR COOLING $26,822 $100,000 Not Implemented
UD0681 # 03 Y:2003 03 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $13,200 $8,060 Not Implemented
UD0681 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,862 $7,947 Implemented