IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,204

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0390 # 06 Y:2006 06 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,951 $31,040 Not Implemented
UF0390 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $29,826 $513 Not Implemented
UF0390 # 08 Y:2006 08 2006 USE PHOTOCELL CONTROLS $909 $306 Not Implemented
UF0390 # 09 Y:2006 09 2006 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $27,903 $20,000 Not Implemented
UF0390 # 10 Y:2006 10 2006 INSTALL OCCUPANCY SENSORS $437 $347 Not Implemented
UF0390 # 11 Y:2006 11 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $10,152 $36,122 Not Implemented
UF0390 # 12 Y:2006 12 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,655 $1,610 Not Implemented
UF0390 # 13 Y:2006 13 2006 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $979 $4,996 Not Implemented
UF0390 # 14 Y:2006 14 2006 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $118,800 $8,400 Not Implemented
UF0389 # 01 Y:2006 01 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $101,986 $13,656 Implemented
UF0389 # 02 Y:2006 02 2006 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $148,933 $6,617 Not Implemented
UF0389 # 03 Y:2006 03 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,110 $0 Not Implemented
UF0389 # 04 Y:2006 04 2006 INSULATE BARE EQUIPMENT $18,625 $21,375 Not Implemented
NC0344 # 01 Y:2006 01 2006 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $789,735 $918,265 Not Implemented
NC0344 # 02 Y:2006 02 2006 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $460,800 $118,971 Implemented
NC0344 # 03 Y:2006 03 2006 RECOVER WASTE HEAT FROM EQUIPMENT $48,795 $35,000 Not Implemented
NC0344 # 04 Y:2006 04 2006 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION $62,722 $50,000 Implemented
NC0344 # 05 Y:2006 05 2006 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $29,955 $5,000 Not Implemented
NC0344 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,686 $4,423 Implemented
UD0749 # 01 Y:2006 01 2006 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $973,467 $1,500,000 Not Implemented
UD0749 # 02 Y:2006 02 2006 REDUCE VENTILATION AIR $359,088 $0 Not Implemented
UD0749 # 03 Y:2006 03 2006 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $211,000 $7,200 Implemented
UD0749 # 04 Y:2006 04 2006 HEAT TREAT PARTS ONLY TO REQUIRED SPECIFICATIONS OR STANDARDS $151,097 $0 Not Implemented
UD0749 # 05 Y:2006 05 2006 INSULATE BARE EQUIPMENT $128,436 $44,181 Implemented
UD0749 # 06 Y:2006 06 2006 MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS $127,000 $20,000 Not Implemented