Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,204
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0390 # 06 Y:2006 | 06 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,951 | $31,040 | Not Implemented |
UF0390 # 07 Y:2006 | 07 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $29,826 | $513 | Not Implemented |
UF0390 # 08 Y:2006 | 08 | 2006 | USE PHOTOCELL CONTROLS | $909 | $306 | Not Implemented |
UF0390 # 09 Y:2006 | 09 | 2006 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $27,903 | $20,000 | Not Implemented |
UF0390 # 10 Y:2006 | 10 | 2006 | INSTALL OCCUPANCY SENSORS | $437 | $347 | Not Implemented |
UF0390 # 11 Y:2006 | 11 | 2006 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $10,152 | $36,122 | Not Implemented |
UF0390 # 12 Y:2006 | 12 | 2006 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,655 | $1,610 | Not Implemented |
UF0390 # 13 Y:2006 | 13 | 2006 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $979 | $4,996 | Not Implemented |
UF0390 # 14 Y:2006 | 14 | 2006 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $118,800 | $8,400 | Not Implemented |
UF0389 # 01 Y:2006 | 01 | 2006 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $101,986 | $13,656 | Implemented |
UF0389 # 02 Y:2006 | 02 | 2006 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $148,933 | $6,617 | Not Implemented |
UF0389 # 03 Y:2006 | 03 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,110 | $0 | Not Implemented |
UF0389 # 04 Y:2006 | 04 | 2006 | INSULATE BARE EQUIPMENT | $18,625 | $21,375 | Not Implemented |
NC0344 # 01 Y:2006 | 01 | 2006 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $789,735 | $918,265 | Not Implemented |
NC0344 # 02 Y:2006 | 02 | 2006 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $460,800 | $118,971 | Implemented |
NC0344 # 03 Y:2006 | 03 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $48,795 | $35,000 | Not Implemented |
NC0344 # 04 Y:2006 | 04 | 2006 | LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION | $62,722 | $50,000 | Implemented |
NC0344 # 05 Y:2006 | 05 | 2006 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $29,955 | $5,000 | Not Implemented |
NC0344 # 06 Y:2006 | 06 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,686 | $4,423 | Implemented |
UD0749 # 01 Y:2006 | 01 | 2006 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $973,467 | $1,500,000 | Not Implemented |
UD0749 # 02 Y:2006 | 02 | 2006 | REDUCE VENTILATION AIR | $359,088 | $0 | Not Implemented |
UD0749 # 03 Y:2006 | 03 | 2006 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $211,000 | $7,200 | Implemented |
UD0749 # 04 Y:2006 | 04 | 2006 | HEAT TREAT PARTS ONLY TO REQUIRED SPECIFICATIONS OR STANDARDS | $151,097 | $0 | Not Implemented |
UD0749 # 05 Y:2006 | 05 | 2006 | INSULATE BARE EQUIPMENT | $128,436 | $44,181 | Implemented |
UD0749 # 06 Y:2006 | 06 | 2006 | MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS | $127,000 | $20,000 | Not Implemented |