IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,295

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CL2110 # 06 Y:2021 06 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $22,030 $0 n/a
CL2110 # 07 Y:2021 07 2021 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $8,000 $0 n/a
UF0566 # 01 Y:2021 01 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,527 $41,169 Implemented
UF0566 # 02 Y:2021 02 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $6,690 $2,000 Not Implemented
UF0566 # 03 Y:2021 03 2021 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $5,976 $16,642 Implemented
UF0566 # 04 Y:2021 04 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,332 $0 Implemented
UF0566 # 05 Y:2021 05 2021 REUSE / RECYCLE/ SELL PAPER PRODUCTS $450,043 $53,000 Not Implemented
UF0566 # 06 Y:2021 06 2021 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $4,159 $4,000 Not Implemented
UF0566 # 07 Y:2021 07 2021 MINIMIZE WATER USAGE $1,899 $0 Implemented
UF0566 # 08 Y:2021 08 2021 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $1,187 $0 Implemented
SF0570 # 01 Y:2021 01 2021 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $24,674 $0 Implemented
SF0570 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $27,893 $0 Implemented
SF0570 # 03 Y:2021 03 2021 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $149,399 $10,195 Implemented
SF0570 # 04 Y:2021 04 2021 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $71,549 $5,641 Implemented
SF0570 # 05 Y:2021 05 2021 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $106,544 $31,500 Not Implemented
SF0570 # 06 Y:2021 06 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $514 $190 Not Implemented
SF0570 # 07 Y:2021 07 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $39,174 $48,150 Not Implemented
SF0570 # 08 Y:2021 08 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,387 $6,315 Implemented
SF0570 # 09 Y:2021 09 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $291 $648 Implemented
SF0570 # 10 Y:2021 10 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,784 $27,535 Not Implemented
SF0570 # 11 Y:2021 11 2021 USE SOLAR HEAT TO MAKE ELECTRICTY $179,262 $1,269,472 Implemented
NL0059 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,547 $51,468 Implemented
NL0059 # 02 Y:2021 02 2021 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $8,198 $50,347 Not Implemented
NL0059 # 03 Y:2021 03 2021 INSTALL OCCUPANCY SENSORS $702 $4,153 Not Implemented
NL0059 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $479 $500 Implemented