IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,942

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0995 # 08 Y:2019 08 2019 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $606 $0 Implemented
UD0995 # 09 Y:2019 09 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,887 $17,856 Implemented
UD0994 # 01 Y:2019 01 2019 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $100,170 $0 Not Implemented
UD0994 # 02 Y:2019 02 2019 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $5,091 $700 Not Implemented
UD0994 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $46,649 $33,788 Not Implemented
UD0994 # 04 Y:2019 04 2019 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $248,034 $337,264 Implemented
UD0994 # 05 Y:2019 05 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,349 $10,250 Not Implemented
UD0994 # 06 Y:2019 06 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,968 $8,550 Not Implemented
UD0993 # 01 Y:2018 01 2018 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $27,720 $0 Not Implemented
UD0993 # 02 Y:2018 02 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $392 $0 Not Implemented
UD0993 # 03 Y:2018 03 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $302 $0 Not Implemented
UD0993 # 04 Y:2018 04 2018 INSTALL OCCUPANCY SENSORS $2,531 $2,940 Implemented
UD0993 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,977 $9,300 Implemented
UD0993 # 06 Y:2018 06 2018 COVER OPEN TANKS $3,170 $5,040 Not Implemented
UD0992 # 01 Y:2018 01 2018 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $14,245 $700 Implemented
UD0992 # 02 Y:2018 02 2018 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $48,158 $1,000 Not Implemented
UD0992 # 03 Y:2018 03 2018 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $30,337 $32,600 Not Implemented
UD0992 # 04 Y:2018 04 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $11,815 $0 Not Implemented
UD0992 # 05 Y:2018 05 2018 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $3,174 $9,900 Not Implemented
WV0566 # 01 Y:2018 01 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $64,590 $114,000 Not Implemented
WV0566 # 02 Y:2018 02 2018 DEVELOP A REPAIR/REPLACE POLICY $4,621 $945 Implemented
WV0566 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,255 $600 Implemented
WV0566 # 04 Y:2018 04 2018 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,029 $500 Implemented
WV0566 # 05 Y:2018 05 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,643 $5,200 Not Implemented
WV0566 # 06 Y:2018 06 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,581 $575 Implemented