IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,756

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0494 # 15 Y:2005 15 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $7,580 $19,700 Not Implemented
OR0492 # 01 Y:2005 01 2005 TREAT AND REUSE RINSE WATERS $96,200 $30,000 Implemented
OR0492 # 02 Y:2005 02 2005 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $56,000 $167,300 Not Implemented
OR0492 # 03 Y:2005 03 2005 METER WASTE WATER $52,000 $6,300 Not Implemented
OR0492 # 04 Y:2005 04 2005 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $34,000 $190,000 Not Implemented
OR0492 # 05 Y:2005 05 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $11,600 $1,800 Implemented
OR0492 # 06 Y:2005 06 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,130 $0 Implemented
OR0492 # 07 Y:2005 07 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,568 $6,500 Implemented
OR0492 # 08 Y:2005 08 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,984 $7,300 Implemented
OR0492 # 09 Y:2005 09 2005 OPTIMIZE PLANT POWER FACTOR $2,200 $10,000 Implemented
OR0491 # 01 Y:2005 01 2005 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $22,340 $0 Not Implemented
OR0491 # 02 Y:2005 02 2005 MODIFY MATERIAL APPLICATION METHODS $17,000 $7,200 Not Implemented
OR0491 # 03 Y:2005 03 2005 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $14,000 $7,200 Not Implemented
OR0491 # 04 Y:2005 04 2005 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $1,180 $1,000 Not Implemented
OR0491 # 05 Y:2005 05 2005 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $730 $1,300 Not Implemented
OR0491 # 06 Y:2005 06 2005 INSTALL OCCUPANCY SENSORS $2,440 $1,900 Not Implemented
OR0491 # 07 Y:2005 07 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $7,040 $10,650 Not Implemented
OR0491 # 08 Y:2005 08 2005 OPTIMIZE PLANT POWER FACTOR $650 $1,800 Not Implemented
OR0490 # 01 Y:2005 01 2005 USE LESS WASTEFUL PACKAGING $35,000 $1,000 Not Implemented
OR0490 # 02 Y:2005 02 2005 USE LESS WASTEFUL PACKAGING $23,500 $1,000 Not Implemented
OR0490 # 03 Y:2005 03 2005 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $24,000 $0 Not Implemented
OR0490 # 04 Y:2005 04 2005 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $10,400 $1,000 Not Implemented
OR0490 # 05 Y:2005 05 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,600 $0 Not Implemented
OR0490 # 06 Y:2005 06 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $8,100 $1,800 Not Implemented
OR0490 # 07 Y:2005 07 2005 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,720 $0 Not Implemented