IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,520

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0143 # 05 Y:1999 05 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,608 $2,000 Not Implemented
BD0143 # 06 Y:1999 06 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,354 $825 Not Implemented
BD0143 # 07 Y:1999 07 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,655 $0 Not Implemented
BD0143 # 08 Y:1999 08 1999 INSTALL OCCUPANCY SENSORS $2,059 $1,500 Not Implemented
BD0143 # 09 Y:1999 09 1999 RECOVER WASTE HEAT FROM EQUIPMENT $6,405 $25,000 Not Implemented
BD0143 # 10 Y:1999 10 1999 MINIMIZE WATER USAGE $1,019 $1,850 Not Implemented
BD0143 # 11 Y:1999 11 1999 PAY BILLS ON TIME TO AVOID LATE FEES $439 $0 Not Implemented
AS0262 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,565 $3,139 Not Implemented
AS0262 # 02 Y:1999 02 1999 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $4,369 $1,700 Implemented
AS0262 # 03 Y:1999 03 1999 USE SYNTHETIC LUBRICANT $1,269 $2,378 Not Implemented
AS0262 # 04 Y:1999 04 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,548 $100 Implemented
AS0262 # 05 Y:1999 05 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $3,402 $120 Not Implemented
AS0262 # 06 Y:1999 06 1999 METER WASTE WATER $2,057 $5,000 Not Implemented
AS0262 # 07 Y:1999 07 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $178,632 $50,000 Not Implemented
AS0262 # 08 Y:1999 08 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $11,081 $25,000 Not Implemented
AS0256 # 01 Y:1999 01 1999 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $6,547 $4,500 Not Implemented
AS0256 # 02 Y:1999 02 1999 INSTALL OCCUPANCY SENSORS $9,763 $2,550 Not Implemented
AS0256 # 03 Y:1999 03 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,273 $1,496 Not Implemented
AS0256 # 04 Y:1999 04 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,376 $14,720 Not Implemented
AS0256 # 05 Y:1999 05 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,301 $22,500 Not Implemented
AS0256 # 06 Y:1999 06 1999 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $4,880 $4,220 Not Implemented
AS0256 # 07 Y:1999 07 1999 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $22,194 $2,804 Not Implemented
AS0256 # 08 Y:1999 08 1999 DE-ENERGIZE EXCESS TRANSFORMER CAPACITY $23,808 $59,466 Not Implemented
AS0256 # 09 Y:1999 09 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $3,644 $120 Not Implemented
AS0256 # 10 Y:1999 10 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $3,507 $30 Not Implemented