IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,204

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0749 # 07 Y:2006 07 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $111,197 $15,000 Not Implemented
UD0749 # 08 Y:2006 08 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $98,501 $34,560 Implemented
UD0749 # 09 Y:2006 09 2006 UPGRADE CONTROLS ON COMPRESSORS $25,009 $45,000 Implemented
UD0749 # 10 Y:2006 10 2006 INSTALL TIMERS AND/OR THERMOSTATS $22,598 $20,000 Implemented
UD0749 # 11 Y:2006 11 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,254 $0 Implemented
UD0749 # 12 Y:2006 12 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,896 $13,819 Not Implemented
UD0749 # 13 Y:2006 13 2006 USE MINIMUM SAFE OVEN VENTILATION $4,400 $0 Implemented
NC0343 # 01 Y:2006 01 2006 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $137,000 $28,000 Not Implemented
NC0343 # 02 Y:2006 02 2006 REDESIGN PROCESS $54,257 $30,000 Not Implemented
NC0343 # 03 Y:2006 03 2006 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $73,265 $260,000 Not Implemented
NC0343 # 04 Y:2006 04 2006 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $18,719 $10,000 Not Implemented
NC0343 # 05 Y:2006 05 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $76,598 $14,000 Not Implemented
NC0343 # 06 Y:2006 06 2006 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,384 $3,000 Not Implemented
NC0343 # 07 Y:2006 07 2006 INSTALL SENSORS TO DETECT DEFECTS $1,350,000 $800,000 Not Implemented
NC0343 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $312 $424 Not Implemented
IA0395 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,347 $11,263 Implemented
IA0395 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,322 $27,832 Implemented
IA0395 # 03 Y:2006 03 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $751 $0 Implemented
IA0395 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,776 $672 Implemented
IA0395 # 05 Y:2006 05 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,463 $9,500 Not Implemented
UF0388 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,746 $4,846 Not Implemented
UF0388 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,378 $1,688 Not Implemented
UF0388 # 03 Y:2006 03 2006 INSTALL OCCUPANCY SENSORS $341 $342 Not Implemented
UF0388 # 04 Y:2006 04 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $922 $2,346 Not Implemented
UF0388 # 05 Y:2006 05 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $7,286 $1,238 Not Implemented