Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,260
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0520 # 02 Y:2007 | 02 | 2007 | $15,400 | $0 | Implemented | |
OR0520 # 03 Y:2007 | 03 | 2007 | INSTALL OCCUPANCY SENSORS | $11,700 | $31,650 | Implemented |
OR0520 # 04 Y:2007 | 04 | 2007 | INSTALL OCCUPANCY SENSORS | $8,600 | $17,550 | Implemented |
OR0520 # 05 Y:2007 | 05 | 2007 | FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM | $4,800 | $6,400 | Implemented |
OR0520 # 06 Y:2007 | 06 | 2007 | REPLACE BOILER | $4,900 | $5,250 | Implemented |
OR0520 # 07 Y:2007 | 07 | 2007 | INSULATE FEEDWATER TANK | $3,400 | $2,160 | Implemented |
LE0261 # 01 Y:2007 | 01 | 2007 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $196,792 | $500 | Not Implemented |
LE0261 # 02 Y:2007 | 02 | 2007 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $71,526 | $75,000 | Not Implemented |
LE0261 # 03 Y:2007 | 03 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,454 | $12,000 | Not Implemented |
LE0261 # 04 Y:2007 | 04 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $15,461 | $20 | Implemented |
LE0261 # 05 Y:2007 | 05 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,661 | $100 | Implemented |
LE0261 # 06 Y:2007 | 06 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,137 | $5,000 | Not Implemented |
LE0261 # 07 Y:2007 | 07 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $6,155 | $1,500 | Implemented |
LE0261 # 08 Y:2007 | 08 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,476 | $150 | Implemented |
LE0261 # 09 Y:2007 | 09 | 2007 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $3,985 | $300 | Not Implemented |
WV0362 # 01 Y:2007 | 01 | 2007 | INSULATE BARE EQUIPMENT | $80,064 | $26,135 | Not Implemented |
WV0362 # 02 Y:2007 | 02 | 2007 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $10,461 | $13,900 | Not Implemented |
WV0362 # 03 Y:2007 | 03 | 2007 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,679 | $2,000 | Not Implemented |
WV0362 # 04 Y:2007 | 04 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,748 | $660 | Not Implemented |
WV0362 # 05 Y:2007 | 05 | 2007 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,397 | $0 | Implemented |
WV0362 # 06 Y:2007 | 06 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,787 | $0 | Implemented |
WV0362 # 07 Y:2007 | 07 | 2007 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,693 | $1,500 | Implemented |
WV0362 # 08 Y:2007 | 08 | 2007 | DEVELOP A REPAIR/REPLACE POLICY | $1,851 | $185 | Implemented |
WV0362 # 09 Y:2007 | 09 | 2007 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $1,851 | $1,000 | Implemented |
WV0362 # 10 Y:2007 | 10 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,521 | $978 | Implemented |