IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,302

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0409 # 06 Y:2008 06 2008 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,067 $183 Implemented
UM0340 # 01 Y:2008 01 2008 OPTIMIZE PLANT POWER FACTOR $15,424 $32,000 Implemented
UM0340 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $490 $447 Not Implemented
UM0340 # 03 Y:2008 03 2008 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $439 $250 Not Implemented
UM0340 # 04 Y:2008 04 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $329 $500 Implemented
UW0022 # 01 Y:2008 01 2008 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $89,303 $52,321 Not Implemented
UW0022 # 02 Y:2008 02 2008 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $44,200 $27,200 Not Implemented
UW0022 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,636 $4,640 Implemented
UW0022 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,233 $9,804 Not Implemented
UW0022 # 05 Y:2008 05 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,153 $0 Not Implemented
UW0022 # 06 Y:2008 06 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,172 $180 Implemented
UW0022 # 07 Y:2008 07 2008 INSULATE BARE EQUIPMENT $2,130 $1,260 Not Implemented
UW0022 # 08 Y:2008 08 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,849 $14,505 Not Implemented
IA0430 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,156 $23,886 Not Implemented
IA0430 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $444 $1,291 Not Implemented
IA0430 # 03 Y:2008 03 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $388 $19 Implemented
IA0430 # 04 Y:2008 04 2008 RECOVER WASTE HEAT FROM EQUIPMENT $1,064 $1,045 Not Implemented
IA0430 # 05 Y:2008 05 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,111 $411 Implemented
IA0430 # 06 Y:2008 06 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $329 $444 Not Implemented
IA0430 # 07 Y:2008 07 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $648 $1,617 Implemented
MS0331 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $91,249 $79,567 Not Implemented
MS0331 # 02 Y:2008 02 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $81,985 $18,000 Not Implemented
MS0331 # 03 Y:2008 03 2008 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $23,107 $0 Not Implemented
MS0331 # 04 Y:2008 04 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,285 $401 Not Implemented
MS0331 # 05 Y:2008 05 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $15,715 $2,550 Not Implemented