IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,715

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0488 # 08 Y:2016 08 2016 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $16,810 $61,903 Not Implemented
UM0471 # 01 Y:2016 01 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,290 $500 n/a
UM0471 # 02 Y:2016 02 2016 INSTALL OCCUPANCY SENSORS $1,462 $1,750 n/a
UM0471 # 03 Y:2016 03 2016 INSULATE BARE EQUIPMENT $696 $2,500 n/a
UM0471 # 04 Y:2016 04 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,519 $5,500 n/a
UM0471 # 05 Y:2016 05 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,664 $3,435 n/a
WM0091 # 01 Y:2016 01 2016 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $12,568 $2,860 Not Implemented
WM0091 # 02 Y:2016 02 2016 COMBINE UTILITY METERS $8,777 $30,000 Not Implemented
WM0091 # 03 Y:2016 03 2016 INSTALL OCCUPANCY SENSORS $2,746 $1,275 Not Implemented
WM0091 # 04 Y:2016 04 2016 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $2,722 $0 Not Implemented
WM0091 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,051 $230 Implemented
WM0091 # 06 Y:2016 06 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,795 $1,501 Not Implemented
WM0091 # 07 Y:2016 07 2016 USE PHOTOCELL CONTROLS $1,383 $560 Not Implemented
SU0418 # 01 Y:2016 01 2016 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $722 $0 Not Implemented
SU0418 # 02 Y:2016 02 2016 PAY BILLS ON TIME TO AVOID LATE FEES $641 $0 Implemented
SU0418 # 03 Y:2016 03 2016 DISCONNECT BALLASTS $870 $0 Not Implemented
SU0418 # 04 Y:2016 04 2016 INSTALL OCCUPANCY SENSORS $336 $333 Implemented
SU0418 # 05 Y:2016 05 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $729 $1,308 Not Implemented
BS0081 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,089 $4,550 Implemented
BS0081 # 02 Y:2016 02 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $10,309 $150 Implemented
BS0081 # 03 Y:2016 03 2016 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $72 $311 Not Implemented
BS0081 # 04 Y:2016 04 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,916 $80 Not Implemented
BS0081 # 05 Y:2016 05 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $462 $15 Implemented
BS0081 # 06 Y:2016 06 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $401 $550 Implemented
MI0301 # 01 Y:2016 01 2016 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $15,850 $1,120 Not Implemented