Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,718
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
ORC003 # 03 Y:2022 | 03 | 2022 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $3,529 | $72,976 | Not Implemented |
ORC003 # 04 Y:2022 | 04 | 2022 | INSTALL TIMERS AND/OR THERMOSTATS | $759 | $2,250 | Not Implemented |
ORC003 # 05 Y:2022 | 05 | 2022 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $61 | $300 | Not Implemented |
WV0630 # 01 Y:2022 | 01 | 2022 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $11,322 | $44,160 | Not Implemented |
WV0630 # 02 Y:2022 | 02 | 2022 | INSTALL OCCUPANCY SENSORS | $2,677 | $7,291 | Implemented |
WV0630 # 03 Y:2022 | 03 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,523 | $279 | Implemented |
WV0630 # 04 Y:2022 | 04 | 2022 | MINIMIZE WATER USAGE | $706 | $2,559 | Implemented |
WV0630 # 05 Y:2022 | 05 | 2022 | UPGRADE CONTROLS ON COMPRESSORS | $405 | $1,431 | Implemented |
WV0630 # 06 Y:2022 | 06 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $371 | $911 | Implemented |
WV0630 # 07 Y:2022 | 07 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $305 | $510 | Implemented |
AM0855 # 01 Y:2022 | 01 | 2022 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $32,345 | $5,000 | Implemented |
AM0855 # 02 Y:2022 | 02 | 2022 | OPTIMIZE PLANT POWER FACTOR | $7,487 | $13,455 | Not Implemented |
AM0855 # 03 Y:2022 | 03 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,775 | $2,575 | Not Implemented |
AM0855 # 04 Y:2022 | 04 | 2022 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,135 | $0 | Implemented |
AM0855 # 05 Y:2022 | 05 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,650 | $1,000 | Implemented |
AM0855 # 06 Y:2022 | 06 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $830 | $2,100 | Implemented |
AM0855 # 07 Y:2022 | 07 | 2022 | INSTALL OCCUPANCY SENSORS | $410 | $1,085 | Implemented |
MS0404 # 01 Y:2022 | 01 | 2022 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $176,387 | $1,148,430 | Not Implemented |
MS0404 # 02 Y:2022 | 02 | 2022 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $9,805 | $22,420 | Not Implemented |
MS0404 # 03 Y:2022 | 03 | 2022 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $853 | $525 | Not Implemented |
MS0404 # 04 Y:2022 | 04 | 2022 | OPTIMIZE PLANT POWER FACTOR | $14,973 | $3,790 | Not Implemented |
SF0589 # 01 Y:2022 | 01 | 2022 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $14,854 | $0 | Implemented |
SF0589 # 02 Y:2022 | 02 | 2022 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $53,458 | $172,352 | Not Implemented |
SF0589 # 03 Y:2022 | 03 | 2022 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $20,922 | $73,113 | Not Implemented |
SF0589 # 04 Y:2022 | 04 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,794 | $15,591 | Implemented |