IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

146,354

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0545 # 10 Y:2017 10 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $268 $20 Implemented
WV0545 # 11 Y:2017 11 2017 MINIMIZE WATER USAGE $65 $300 Not Implemented
WV0545 # 12 Y:2017 12 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $60 $128 Not Implemented
UM0487 # 01 Y:2017 01 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,265 $4,500 n/a
UM0487 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $42,701 $105,530 n/a
UM0487 # 03 Y:2017 03 2017 COVER OPEN TANKS $23,071 $2,137 n/a
MA0774 # 01 Y:2017 01 2017 USE SOLAR HEAT FOR HEAT $58,825 $627,522 Implemented
MA0774 # 02 Y:2017 02 2017 IMPROVE COMBUSTION CONTROL CAPABILITY $12,851 $21,075 Not Implemented
MA0774 # 03 Y:2017 03 2017 INSTALL / REPAIR INSULATION ON STEAM LINES $4,135 $27,198 Not Implemented
MA0774 # 04 Y:2017 04 2017 INSTALL / REPAIR INSULATION ON STEAM LINES $2,868 $652 Implemented
MA0774 # 05 Y:2017 05 2017 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $2,908 $1,775 Implemented
SU0441 # 01 Y:2017 01 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,195 $0 Not Implemented
SU0441 # 02 Y:2017 02 2017 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $10,649 $1,130 Not Implemented
SU0441 # 03 Y:2017 03 2017 RECOVER WASTE HEAT FROM EQUIPMENT $3,779 $459 Not Implemented
SU0441 # 04 Y:2017 04 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,408 $879 Not Implemented
SU0441 # 05 Y:2017 05 2017 ELIMINATE/REDUCE AN OPERATION $630 $762 Not Implemented
SU0441 # 06 Y:2017 06 2017 REDUCE VENTILATION AIR $448 $1,147 Not Implemented
SU0441 # 07 Y:2017 07 2017 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $299 $916 Not Implemented
TT0193 # 01 Y:2017 01 2017 INSULATE BARE EQUIPMENT $35,857 $10,000 Implemented
TT0193 # 02 Y:2017 02 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $12,374 $32,000 Implemented
TT0193 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,088 $22,470 Not Implemented
TT0193 # 04 Y:2017 04 2017 UPGRADE CONTROLS ON COMPRESSORS $5,162 $360 Not Implemented
TT0193 # 05 Y:2017 05 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,550 $3,000 Implemented
TT0193 # 06 Y:2017 06 2017 INSTALL COMMON HEADER ON COMPRESSORS $3,186 $8,600 Not Implemented
TT0193 # 07 Y:2017 07 2017 DEVELOP A REPAIR/REPLACE POLICY $1,978 $4,283 Not Implemented