IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,642

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0147 # 04 Y:2014 04 2014 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $423 $470 Implemented
MZ0147 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,562 $42,645 Implemented
MZ0147 # 06 Y:2014 06 2014 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,184 $600 Implemented
MZ0147 # 07 Y:2014 07 2014 RECOVER WASTE HEAT FROM EQUIPMENT $9,950 $5,290 Not Implemented
MZ0147 # 08 Y:2014 08 2014 INSULATE BARE EQUIPMENT $2,616 $2,613 Not Implemented
MZ0147 # 09 Y:2014 09 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,212 $420 Implemented
MZ0147 # 10 Y:2014 10 2014 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $3,158 $250 Implemented
MZ0142 # 01 Y:2014 01 2014 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $5,862 $6,500 Not Implemented
MZ0142 # 02 Y:2014 02 2014 RECOVER WASTE HEAT FROM EQUIPMENT $505 $1,000 Not Implemented
MZ0142 # 03 Y:2014 03 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,716 $2,500 Not Implemented
MZ0142 # 04 Y:2014 04 2014 INSULATE BARE EQUIPMENT $206 $720 Not Implemented
MZ0142 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,435 $31,000 Implemented
MZ0142 # 06 Y:2014 06 2014 USE PHOTOCELL CONTROLS $1,432 $980 Not Implemented
MZ0148 # 01 Y:2014 01 2014 USE PHOTOCELL CONTROLS $1,021 $980 Implemented
MZ0148 # 02 Y:2014 02 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $549 $850 Not Implemented
MZ0148 # 03 Y:2014 03 2014 INSULATE BARE EQUIPMENT $1,630 $897 Not Implemented
MZ0148 # 04 Y:2014 04 2014 INSULATE BARE EQUIPMENT $546 $2,000 Implemented
MZ0148 # 05 Y:2014 05 2014 INSULATE BARE EQUIPMENT $2,225 $4,000 Not Implemented
MZ0148 # 06 Y:2014 06 2014 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,573 $1,700 Not Implemented
MZ0148 # 07 Y:2014 07 2014 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $380 $1,000 Implemented
MZ0141 # 01 Y:2014 01 2014 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $2,625 $7,000 Implemented
MZ0141 # 02 Y:2014 02 2014 LOWER CEILING TO REDUCE CONDITIONED SPACE $12,947 $24,000 Not Implemented
MZ0141 # 03 Y:2014 03 2014 RECOVER WASTE HEAT FROM EQUIPMENT $3,254 $11,500 Not Implemented
MZ0141 # 04 Y:2014 04 2014 RECOVER WASTE HEAT FROM EQUIPMENT $4,000 $6,000 Not Implemented
MZ0141 # 05 Y:2014 05 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $11,440 $2,500 Not Implemented