Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,656
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0152 # 05 Y:2014 | 05 | 2014 | INSULATE BARE EQUIPMENT | $9,287 | $9,958 | Not Implemented |
MZ0152 # 06 Y:2014 | 06 | 2014 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $39,777 | $37,700 | Not Implemented |
MZ0145 # 01 Y:2014 | 01 | 2014 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $89,896 | $277,500 | Not Implemented |
MZ0145 # 02 Y:2014 | 02 | 2014 | INSULATE BARE EQUIPMENT | $105,420 | $300,000 | Implemented |
MZ0145 # 03 Y:2014 | 03 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $192,210 | $220,000 | Implemented |
MZ0145 # 04 Y:2014 | 04 | 2014 | UPGRADE CONTROLS ON COMPRESSORS | $113,101 | $200,000 | Implemented |
MZ0145 # 05 Y:2014 | 05 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $629 | $1,000 | Not Implemented |
MZ0145 # 06 Y:2014 | 06 | 2014 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $17,814 | $30,000 | Implemented |
MZ0145 # 07 Y:2014 | 07 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,268 | $0 | Implemented |
MZ0145 # 08 Y:2014 | 08 | 2014 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,868 | $0 | Implemented |
MZ0145 # 09 Y:2014 | 09 | 2014 | USE PHOTOCELL CONTROLS | $1,686 | $2,450 | Implemented |
MZ0147 # 01 Y:2014 | 01 | 2014 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $871 | $360 | Implemented |
MZ0147 # 02 Y:2014 | 02 | 2014 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $63 | $235 | Implemented |
MZ0147 # 03 Y:2014 | 03 | 2014 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $63 | $235 | Implemented |
MZ0147 # 04 Y:2014 | 04 | 2014 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $423 | $470 | Implemented |
MZ0147 # 05 Y:2014 | 05 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,562 | $42,645 | Implemented |
MZ0147 # 06 Y:2014 | 06 | 2014 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $1,184 | $600 | Implemented |
MZ0147 # 07 Y:2014 | 07 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $9,950 | $5,290 | Not Implemented |
MZ0147 # 08 Y:2014 | 08 | 2014 | INSULATE BARE EQUIPMENT | $2,616 | $2,613 | Not Implemented |
MZ0147 # 09 Y:2014 | 09 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,212 | $420 | Implemented |
MZ0147 # 10 Y:2014 | 10 | 2014 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $3,158 | $250 | Implemented |
MZ0142 # 01 Y:2014 | 01 | 2014 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $5,862 | $6,500 | Not Implemented |
MZ0142 # 02 Y:2014 | 02 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $505 | $1,000 | Not Implemented |
MZ0142 # 03 Y:2014 | 03 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,716 | $2,500 | Not Implemented |
MZ0142 # 04 Y:2014 | 04 | 2014 | INSULATE BARE EQUIPMENT | $206 | $720 | Not Implemented |