IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,582

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0078 # 03 Y:2004 03 2004 RECOVER WASTE HEAT FROM EQUIPMENT $4,890 $4,820 Implemented
UU0078 # 04 Y:2004 04 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,970 $400 Implemented
UU0078 # 05 Y:2004 05 2004 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $5,620 $12,000 Not Implemented
UU0078 # 06 Y:2004 06 2004 CONTRACT A WOOD PALLET RECYCLING COMPANY $5,720 $1,120 Not Implemented
UU0078 # 07 Y:2004 07 2004 OPTIMIZE PLANT POWER FACTOR $10,400 $11,590 Not Implemented
UU0078 # 08 Y:2004 08 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $810 $450 Implemented
UU0077 # 01 Y:2004 01 2004 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $12,125 $2,670 Not Implemented
UU0077 # 02 Y:2004 02 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,520 $5,000 Implemented
UU0077 # 03 Y:2004 03 2004 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $14,890 $45,000 Implemented
UU0077 # 04 Y:2004 04 2004 ADJUST PH FOR NEUTRALIZATION $12,850 $45,920 Not Implemented
UU0076 # 01 Y:2004 01 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,600 $2,000 Not Implemented
UU0076 # 02 Y:2004 02 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $24 $40 Not Implemented
UU0076 # 03 Y:2004 03 2004 UTILIZE A LESS EXPENSIVE COOLING METHOD $30 $0 Not Implemented
UU0076 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,300 $4,824 Not Implemented
UU0076 # 05 Y:2004 05 2004 METER WASTE WATER $5,360 $1,500 Not Implemented
UU0076 # 06 Y:2004 06 2004 OPTIMIZE PLANT POWER FACTOR $1,982 $2,220 Not Implemented
UU0075 # 01 Y:2004 01 2004 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $400 $250 Not Implemented
UU0075 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,590 $1,320 Implemented
UU0075 # 03 Y:2004 03 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,700 $8,000 Not Implemented
UU0075 # 04 Y:2004 04 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,120 $150 Implemented
UU0075 # 05 Y:2004 05 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,270 $1,000 Implemented
UU0075 # 06 Y:2004 06 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,540 $8,000 Not Implemented
UU0075 # 07 Y:2004 07 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $980 $4,500 Not Implemented
UU0074 # 01 Y:2004 01 2004 RECOVER WASTE HEAT FROM EQUIPMENT $29,620 $45,000 Not Implemented
UU0074 # 02 Y:2004 02 2004 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $6,200 $17,000 Not Implemented