IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,474

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AR0039 # 07 Y:1994 07 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,092 $750 Implemented
AR0039 # 08 Y:1994 08 1994 REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE $26,724 $32,000 Not Implemented
HO0091 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,017 $1,493 Implemented
HO0091 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $289 $1,093 Implemented
HO0091 # 03 Y:1994 03 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $203 $483 Implemented
HO0091 # 04 Y:1994 04 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,045 $400 Not Implemented
HO0091 # 05 Y:1994 05 1994 INSULATE BARE EQUIPMENT $2,042 $6,430 Not Implemented
IA0093 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,269 $9,543 Implemented
IA0093 # 02 Y:1994 02 1994 USE PHOTOCELL CONTROLS $1,868 $443 Implemented
IA0093 # 03 Y:1994 03 1994 INSTALL OCCUPANCY SENSORS $476 $1,267 Implemented
IA0093 # 04 Y:1994 04 1994 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $10,114 $28,000 Not Implemented
IA0093 # 05 Y:1994 05 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,761 $12,000 Not Implemented
IA0093 # 06 Y:1994 06 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,578 $50 Implemented
IA0093 # 07 Y:1994 07 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,400 $263 Implemented
IA0093 # 08 Y:1994 08 1994 OPTIMIZE PLANT POWER FACTOR $2,946 $7,290 Not Implemented
IA0093 # 09 Y:1994 09 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,515 $2,539 Not Implemented
IA0093 # 10 Y:1994 10 1994 INSTALL TIMERS AND/OR THERMOSTATS $321 $130 Not Implemented
KG0010 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $23,359 $48,100 Implemented
KG0010 # 02 Y:1994 02 1994 USE POWER DURING OFF-PEAK PERIODS $21,337 $1,260 Not Implemented
KG0010 # 03 Y:1994 03 1994 INSTALL TIMERS AND/OR THERMOSTATS $7,603 $1,050 Implemented
KG0010 # 04 Y:1994 04 1994 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $695 $2,785 Not Implemented
KG0010 # 05 Y:1994 05 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $657 $2,500 Implemented
KG0010 # 06 Y:1994 06 1994 INSTALL OCCUPANCY SENSORS $139 $390 Not Implemented
HO0090 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,802 $2,384 Not Implemented
HO0090 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,740 $3,662 Not Implemented