Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,872
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0150 # 03 Y:1998 | 03 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,331 | $22,713 | Not Implemented |
SF0150 # 04 Y:1998 | 04 | 1998 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $5,375 | $0 | Implemented |
TN0644 # 01 Y:1998 | 01 | 1998 | AVOID CONTAMINATION OF END PIECES AND REUSE AS FEED STOCK | $363,750 | $20,000 | Not Implemented |
TN0644 # 02 Y:1998 | 02 | 1998 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $32,370 | $50,000 | Implemented |
TN0644 # 03 Y:1998 | 03 | 1998 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $17,850 | $32,200 | Implemented |
TN0644 # 04 Y:1998 | 04 | 1998 | OPTIMIZE PLANT POWER FACTOR | $11,910 | $1,440 | Not Implemented |
TN0644 # 05 Y:1998 | 05 | 1998 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $7,575 | $8,575 | Not Implemented |
TN0644 # 06 Y:1998 | 06 | 1998 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,180 | $2,030 | Implemented |
TN0644 # 07 Y:1998 | 07 | 1998 | INSULATE BARE EQUIPMENT | $2,850 | $1,100 | Not Implemented |
WI0334 # 01 Y:1998 | 01 | 1998 | INSTALL AUTOMATIC PACKING EQUIPMENT | $182,000 | $200,000 | Not Implemented |
WI0334 # 02 Y:1998 | 02 | 1998 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $3,225 | $500 | Implemented |
WI0334 # 03 Y:1998 | 03 | 1998 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $2,932 | $6,000 | Not Implemented |
WI0334 # 04 Y:1998 | 04 | 1998 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,172 | $6,200 | n/a |
WI0334 # 05 Y:1998 | 05 | 1998 | INSTALL TIMERS AND/OR THERMOSTATS | $1,094 | $800 | Implemented |
WI0334 # 06 Y:1998 | 06 | 1998 | MINIMIZE WATER USAGE | $400 | $1,875 | Not Implemented |
WI0334 # 07 Y:1998 | 07 | 1998 | COMBINE UTILITY METERS | $385 | $200 | Implemented |
KU0505 # 01 Y:1998 | 01 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,140 | $9,600 | Implemented |
KU0505 # 02 Y:1998 | 02 | 1998 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,350 | $20 | Implemented |
KU0505 # 03 Y:1998 | 03 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $970 | $400 | Implemented |
KU0505 # 04 Y:1998 | 04 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $720 | $340 | Implemented |
KU0505 # 05 Y:1998 | 05 | 1998 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $510 | $260 | Implemented |
KU0505 # 06 Y:1998 | 06 | 1998 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $800 | $0 | Implemented |
KU0505 # 07 Y:1998 | 07 | 1998 | CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE | $190,000 | $333,750 | Not Implemented |
KU0505 # 08 Y:1998 | 08 | 1998 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $75,000 | $193,000 | Implemented |
KU0505 # 09 Y:1998 | 09 | 1998 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $25,940 | $2,560 | Implemented |