IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,520

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0256 # 11 Y:1999 11 1999 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $51,702 $240 Not Implemented
KU0528 # 01 Y:1999 01 1999 USE IMMERSION HEATING IN TANKS, MELTING POTS, ETC $37,560 $66,040 n/a
KU0528 # 02 Y:1999 02 1999 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $17,330 $800 n/a
KU0528 # 03 Y:1999 03 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,110 $20,590 n/a
KU0528 # 04 Y:1999 04 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,290 $920 n/a
KU0528 # 05 Y:1999 05 1999 INSULATE BARE EQUIPMENT $3,690 $4,240 n/a
KU0528 # 06 Y:1999 06 1999 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $16,430 $9,300 n/a
KU0528 # 07 Y:1999 07 1999 $6,860 $1,280 n/a
KU0528 # 08 Y:1999 08 1999 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $3,290 $2,800 n/a
MA0443 # 01 Y:1999 01 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,232 $3,510 Not Implemented
MA0443 # 02 Y:1999 02 1999 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $656 $150 Implemented
MA0443 # 03 Y:1999 03 1999 INSTALL OCCUPANCY SENSORS $927 $325 Implemented
MA0443 # 04 Y:1999 04 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $287 $1,975 Implemented
MA0443 # 05 Y:1999 05 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $792 $60 Implemented
MA0443 # 06 Y:1999 06 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $169 $160 Not Implemented
SF0172 # 01 Y:1999 01 1999 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $7,540 $0 Implemented
SF0172 # 02 Y:1999 02 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,924 $1,958 Implemented
SF0172 # 03 Y:1999 03 1999 INSULATE BARE EQUIPMENT $1,121 $825 Implemented
SF0172 # 04 Y:1999 04 1999 INSTALL OCCUPANCY SENSORS $2,054 $1,800 Implemented
SF0172 # 05 Y:1999 05 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,100 $15,856 Not Implemented
SF0172 # 06 Y:1999 06 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $124,530 $236,733 Not Implemented
SF0172 # 07 Y:1999 07 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,368 $7,209 Implemented
SF0172 # 08 Y:1999 08 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,548 $14,600 Not Implemented
SF0172 # 09 Y:1999 09 1999 RECOVER WASTE HEAT FROM EQUIPMENT $8,448 $21,777 Implemented
SF0172 # 10 Y:1999 10 1999 USE PHOTOCELL CONTROLS $5,543 $21,500 Not Implemented