IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,394

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0271 # 09 Y:2004 09 2004 INSTALL OCCUPANCY SENSORS $636 $1,200 Not Implemented
BD0271 # 10 Y:2004 10 2004 USE OPTIMUM THICKNESS INSULATION $278 $434 Not Implemented
BD0271 # 11 Y:2004 11 2004 CONTRACT A WOOD PALLET RECYCLING COMPANY $15,320 $180 Implemented
BD0271 # 12 Y:2004 12 2004 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $1,425 $500 Implemented
BD0271 # 13 Y:2004 13 2004 PAY BILLS ON TIME TO AVOID LATE FEES $9,163 $0 Not Implemented
CO0553 # 01 Y:2004 01 2004 UPGRADE CONTROLS ON COMPRESSORS $5,190 $20,000 Not Implemented
CO0553 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,980 $180 Implemented
CO0553 # 03 Y:2004 03 2004 RECOVER WASTE HEAT FROM EQUIPMENT $2,260 $3,020 Not Implemented
CO0553 # 04 Y:2004 04 2004 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $2,260 $8,700 Not Implemented
CO0553 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,930 $20,520 Not Implemented
CO0553 # 06 Y:2004 06 2004 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,620 $15,230 Not Implemented
CO0553 # 07 Y:2004 07 2004 INSTALL OCCUPANCY SENSORS $360 $520 Not Implemented
SD0350 # 01 Y:2004 01 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,900 $0 Implemented
SD0350 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,815 $250 Implemented
SD0350 # 03 Y:2004 03 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,353 $1,650 Implemented
SD0350 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,013 $20,872 Implemented
SD0350 # 05 Y:2004 05 2004 ADD AREA LIGHTING SWITCHES $11,915 $500 Implemented
MS0260 # 01 Y:2004 01 2004 CLEAR AND RENT EXISTING SPACE $28,604 $10,000 Not Implemented
MS0260 # 02 Y:2004 02 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,850 $1,350 Not Implemented
MS0260 # 03 Y:2004 03 2004 MINIMIZE WATER USAGE $9,057 $107 Not Implemented
MS0260 # 04 Y:2004 04 2004 INSTALL TIMERS AND/OR THERMOSTATS $3,685 $1,666 Not Implemented
MS0260 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $811 $348 Implemented
MS0260 # 06 Y:2004 06 2004 DISCONNECT BALLASTS $341 $408 Implemented
MS0260 # 07 Y:2004 07 2004 COVER OPEN TANKS $312 $68 Not Implemented
OR0468 # 01 Y:2004 01 2004 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $19,500 $235 Not Implemented