IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,043

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0021 # 07 Y:2013 07 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,418 $16,300 Not Implemented
SU0350 # 01 Y:2013 01 2013 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $10,408 $0 Implemented
SU0350 # 02 Y:2013 02 2013 CONTRACT A WOOD PALLET RECYCLING COMPANY $8,049 $0 Implemented
SU0350 # 03 Y:2013 03 2013 PAY BILLS ON TIME TO AVOID LATE FEES $1,239 $0 Implemented
SU0350 # 04 Y:2013 04 2013 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $30,158 $131 Implemented
SU0350 # 05 Y:2013 05 2013 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $741 $191 Implemented
SU0350 # 06 Y:2013 06 2013 INSULATE FEEDWATER TANK $579 $190 Implemented
SU0350 # 07 Y:2013 07 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $579 $340 Implemented
SU0350 # 08 Y:2013 08 2013 ELIMINATE/REDUCE AN OPERATION $18,624 $29,949 Not Implemented
SU0350 # 09 Y:2013 09 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $347 $771 Implemented
SU0350 # 10 Y:2013 10 2013 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $298 $705 Not Implemented
SU0350 # 11 Y:2013 11 2013 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $221 $616 Implemented
SU0350 # 12 Y:2013 12 2013 UPGRADE OBSOLETE EQUIPMENT $189 $852 Implemented
WM0030 # 01 Y:2013 01 2013 RECOVER WASTE HEAT FROM EQUIPMENT $1,439 $1,853 Not Implemented
WM0030 # 02 Y:2013 02 2013 USE RADIANT HEATER FOR SPOT HEATING $17,111 $9,180 Not Implemented
WM0030 # 03 Y:2013 03 2013 USE PHOTOCELL CONTROLS $2,234 $4,550 Not Implemented
WM0030 # 04 Y:2013 04 2013 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,570 $500 Not Implemented
WM0030 # 05 Y:2013 05 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,064 $0 Not Implemented
WM0030 # 06 Y:2013 06 2013 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $34,398 $69,000 Implemented
WM0030 # 07 Y:2013 07 2013 MODIFY STARTUP/SHUTDOWN TIMES $3,034 $0 Not Implemented
WM0030 # 08 Y:2013 08 2013 INSTALL OCCUPANCY SENSORS $473 $546 Not Implemented
CO0676 # 01 Y:2013 01 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,670 $2,740 Not Implemented
CO0676 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,020 $250 Implemented
CO0676 # 03 Y:2013 03 2013 REPAIR AND ELIMINATE STEAM LEAKS $730 $900 Implemented
CO0676 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,190 $3,000 Implemented