Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,767
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0139 # 01 Y:2014 | 01 | 2014 | INSTALL / REPAIR INSULATION ON STEAM LINES | $117 | $126 | Not Implemented |
TT0139 # 02 Y:2014 | 02 | 2014 | DISCONNECT BALLASTS | $280 | $100 | Implemented |
TT0139 # 03 Y:2014 | 03 | 2014 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $13,460 | $500 | Implemented |
TT0139 # 04 Y:2014 | 04 | 2014 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $76,287 | $2,900 | Not Implemented |
TT0136 # 01 Y:2014 | 01 | 2014 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $2,000 | $3,250 | Not Implemented |
TT0136 # 02 Y:2014 | 02 | 2014 | INSTALL / REPAIR INSULATION ON STEAM LINES | $6,697 | $5,463 | Not Implemented |
TT0136 # 03 Y:2014 | 03 | 2014 | OPTIMIZE PLANT POWER FACTOR | $1,749 | $4,000 | Not Implemented |
TT0136 # 04 Y:2014 | 04 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,283 | $3,073 | Implemented |
TT0136 # 05 Y:2014 | 05 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,714 | $28,054 | Implemented |
TT0136 # 06 Y:2014 | 06 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $48 | $138 | Implemented |
TT0137 # 01 Y:2014 | 01 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,360 | $822 | Implemented |
TT0137 # 02 Y:2014 | 02 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,154 | $6,230 | Implemented |
TT0137 # 03 Y:2014 | 03 | 2014 | INSTALL SKYLIGHTS | $8,488 | $33,000 | Implemented |
TT0137 # 04 Y:2014 | 04 | 2014 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $6,191 | $5,200 | Not Implemented |
TT0137 # 05 Y:2014 | 05 | 2014 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $26,063 | $4,272 | Implemented |
TT0135 # 01 Y:2014 | 01 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,394 | $100 | Implemented |
TT0135 # 02 Y:2014 | 02 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,172 | $3,000 | Implemented |
TT0135 # 03 Y:2014 | 03 | 2014 | DISCONNECT BALLASTS | $351 | $0 | Not Implemented |
TT0135 # 04 Y:2014 | 04 | 2014 | APPLY FOR INVESTMENT INCENTIVES | $31,797 | $5,000 | Implemented |
TT0132 # 01 Y:2014 | 01 | 2014 | INSTALL / REPAIR INSULATION ON STEAM LINES | $12,064 | $20,731 | Implemented |
TT0132 # 02 Y:2014 | 02 | 2014 | INSTALL / REPAIR INSULATION ON STEAM LINES | $13,762 | $17,000 | Not Implemented |
TT0132 # 03 Y:2014 | 03 | 2014 | OPTIMIZE PLANT POWER FACTOR | $21,103 | $6,000 | Not Implemented |
TT0132 # 04 Y:2014 | 04 | 2014 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $13,713 | $25,000 | Implemented |
TT0132 # 05 Y:2014 | 05 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $894 | $1,750 | Not Implemented |
TT0132 # 06 Y:2014 | 06 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,643 | $0 | Not Implemented |