Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,317
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0399 # 09 Y:2010 | 09 | 2010 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $3,930 | $1,000 | Implemented |
WV0399 # 10 Y:2010 | 10 | 2010 | INSULATE BARE EQUIPMENT | $2,955 | $3,544 | Implemented |
WV0399 # 11 Y:2010 | 11 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,309 | $4,560 | Not Implemented |
WV0399 # 12 Y:2010 | 12 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,246 | $26 | Not Implemented |
WV0399 # 13 Y:2010 | 13 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,498 | $4,153 | Not Implemented |
WV0397 # 01 Y:2009 | 01 | 2009 | REDUCE VENTILATION AIR | $153,645 | $145,000 | Not Implemented |
WV0397 # 02 Y:2009 | 02 | 2009 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $81,057 | $131,239 | Not Implemented |
WV0397 # 03 Y:2009 | 03 | 2009 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $77,885 | $17,000 | Not Implemented |
WV0397 # 04 Y:2009 | 04 | 2009 | OPERATE BOILERS ON HIGH FIRE SETTING | $56,916 | $80,000 | Not Implemented |
WV0397 # 05 Y:2009 | 05 | 2009 | OPTIMIZE PLANT POWER FACTOR | $40,984 | $44,000 | Not Implemented |
WV0397 # 06 Y:2009 | 06 | 2009 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $26,130 | $36,900 | Not Implemented |
WV0397 # 07 Y:2009 | 07 | 2009 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $17,728 | $0 | Implemented |
WV0397 # 08 Y:2009 | 08 | 2009 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $15,726 | $1,000 | Implemented |
WV0397 # 09 Y:2009 | 09 | 2009 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $9,377 | $49,300 | Not Implemented |
WV0397 # 10 Y:2009 | 10 | 2009 | REPAIR OR REPLACE STEAM TRAPS | $7,120 | $5,500 | Implemented |
WV0397 # 11 Y:2009 | 11 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,792 | $19,960 | Implemented |
WV0396 # 01 Y:2009 | 01 | 2009 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $404,150 | $744,800 | Not Implemented |
WV0396 # 02 Y:2009 | 02 | 2009 | USE MINIMUM STEAM OPERATING PRESSURE | $80,973 | $54,000 | Not Implemented |
WV0396 # 03 Y:2009 | 03 | 2009 | USE STEAM PRESSURE REDUCTION TO GENERATE POWER | $72,044 | $295,680 | Not Implemented |
WV0396 # 04 Y:2009 | 04 | 2009 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $69,637 | $1,000 | Implemented |
WV0396 # 05 Y:2009 | 05 | 2009 | INSTALL / REPAIR INSULATION ON STEAM LINES | $10,128 | $3,390 | Implemented |
WV0396 # 06 Y:2009 | 06 | 2009 | DEVELOP A REPAIR/REPLACE POLICY | $9,954 | $1,094 | Implemented |
WV0396 # 07 Y:2009 | 07 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,556 | $10,996 | Not Implemented |
WV0396 # 08 Y:2009 | 08 | 2009 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $8,609 | $1,000 | Implemented |
WV0396 # 09 Y:2009 | 09 | 2009 | OPTIMIZE PLANT POWER FACTOR | $7,614 | $28,000 | Not Implemented |