IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,317

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0399 # 09 Y:2010 09 2010 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $3,930 $1,000 Implemented
WV0399 # 10 Y:2010 10 2010 INSULATE BARE EQUIPMENT $2,955 $3,544 Implemented
WV0399 # 11 Y:2010 11 2010 RECOVER WASTE HEAT FROM EQUIPMENT $2,309 $4,560 Not Implemented
WV0399 # 12 Y:2010 12 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,246 $26 Not Implemented
WV0399 # 13 Y:2010 13 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,498 $4,153 Not Implemented
WV0397 # 01 Y:2009 01 2009 REDUCE VENTILATION AIR $153,645 $145,000 Not Implemented
WV0397 # 02 Y:2009 02 2009 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $81,057 $131,239 Not Implemented
WV0397 # 03 Y:2009 03 2009 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $77,885 $17,000 Not Implemented
WV0397 # 04 Y:2009 04 2009 OPERATE BOILERS ON HIGH FIRE SETTING $56,916 $80,000 Not Implemented
WV0397 # 05 Y:2009 05 2009 OPTIMIZE PLANT POWER FACTOR $40,984 $44,000 Not Implemented
WV0397 # 06 Y:2009 06 2009 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $26,130 $36,900 Not Implemented
WV0397 # 07 Y:2009 07 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $17,728 $0 Implemented
WV0397 # 08 Y:2009 08 2009 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $15,726 $1,000 Implemented
WV0397 # 09 Y:2009 09 2009 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $9,377 $49,300 Not Implemented
WV0397 # 10 Y:2009 10 2009 REPAIR OR REPLACE STEAM TRAPS $7,120 $5,500 Implemented
WV0397 # 11 Y:2009 11 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,792 $19,960 Implemented
WV0396 # 01 Y:2009 01 2009 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $404,150 $744,800 Not Implemented
WV0396 # 02 Y:2009 02 2009 USE MINIMUM STEAM OPERATING PRESSURE $80,973 $54,000 Not Implemented
WV0396 # 03 Y:2009 03 2009 USE STEAM PRESSURE REDUCTION TO GENERATE POWER $72,044 $295,680 Not Implemented
WV0396 # 04 Y:2009 04 2009 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $69,637 $1,000 Implemented
WV0396 # 05 Y:2009 05 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $10,128 $3,390 Implemented
WV0396 # 06 Y:2009 06 2009 DEVELOP A REPAIR/REPLACE POLICY $9,954 $1,094 Implemented
WV0396 # 07 Y:2009 07 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,556 $10,996 Not Implemented
WV0396 # 08 Y:2009 08 2009 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $8,609 $1,000 Implemented
WV0396 # 09 Y:2009 09 2009 OPTIMIZE PLANT POWER FACTOR $7,614 $28,000 Not Implemented