IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,666

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0290 # 10 Y:2009 10 2009 INSTALL OCCUPANCY SENSORS $1,045 $0 Implemented
LE0290 # 11 Y:2009 11 2009 UTILIZE A LESS EXPENSIVE COOLING METHOD $900 $1,500 Not Implemented
LE0290 # 12 Y:2009 12 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $990 $2,500 Implemented
UW0031 # 01 Y:2009 01 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $13,928 $19,446 Not Implemented
UW0031 # 02 Y:2009 02 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,305 $6,000 Not Implemented
UW0031 # 03 Y:2009 03 2009 INSULATE BARE EQUIPMENT $1,741 $5,500 Not Implemented
UW0031 # 04 Y:2009 04 2009 INSULATE BARE EQUIPMENT $144 $61 Not Implemented
OK0779 # 01 Y:2009 01 2009 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $36,513 $900,000 Not Implemented
OK0779 # 02 Y:2009 02 2009 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $122,608 $160,000 Not Implemented
OK0779 # 03 Y:2009 03 2009 USE POWER DURING OFF-PEAK PERIODS $30,940 $0 Not Implemented
OK0779 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,076 $6,396 Not Implemented
OK0779 # 05 Y:2009 05 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,634 $26,750 Implemented
OK0779 # 06 Y:2009 06 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,089 $14,467 Implemented
OK0779 # 07 Y:2009 07 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,569 $0 Implemented
OK0779 # 08 Y:2009 08 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,812 $1,944 Implemented
OK0779 # 09 Y:2009 09 2009 INSTALL TIMERS AND/OR THERMOSTATS $7,677 $989 Not Implemented
UM0353 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $186,999 $237,500 Implemented
UM0353 # 02 Y:2009 02 2009 RECOVER WASTE HEAT FROM EQUIPMENT $26,834 $500 Implemented
UM0353 # 03 Y:2009 03 2009 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $22,477 $22,000 Not Implemented
UM0353 # 04 Y:2009 04 2009 RECOVER WASTE HEAT FROM EQUIPMENT $22,368 $3,000 Implemented
UM0353 # 05 Y:2009 05 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $16,734 $200 Not Implemented
UM0353 # 06 Y:2009 06 2009 USE OPTIMUM TEMPERATURE $13,085 $200 Implemented
UM0353 # 07 Y:2009 07 2009 INSTALL OCCUPANCY SENSORS $9,160 $6,330 Not Implemented
UM0353 # 08 Y:2009 08 2009 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $3,526 $1,500 Implemented
IC0158 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $393 $686 Implemented