Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,737
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0374 # 03 Y:2020 | 03 | 2020 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,237 | $480 | Not Implemented |
MI0374 # 04 Y:2020 | 04 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,360 | $1,980 | Not Implemented |
MI0374 # 05 Y:2020 | 05 | 2020 | INSTALL OCCUPANCY SENSORS | $2,170 | $1,356 | Not Implemented |
MI0374 # 06 Y:2020 | 06 | 2020 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $2,000 | $160 | Not Implemented |
MI0374 # 07 Y:2020 | 07 | 2020 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,446 | $1,238 | Not Implemented |
MI0374 # 08 Y:2020 | 08 | 2020 | USE COMPRESSOR AIR FILTERS | $571 | $562 | Not Implemented |
UU0168 # 01 Y:2020 | 01 | 2020 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,906 | $0 | Implemented |
UU0168 # 02 Y:2020 | 02 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,729 | $15,550 | Implemented |
UU0168 # 03 Y:2020 | 03 | 2020 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,221 | $8,000 | Not Implemented |
UU0168 # 04 Y:2020 | 04 | 2020 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,063 | $0 | Implemented |
UU0168 # 05 Y:2020 | 05 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $251 | $0 | Implemented |
UU0168 # 06 Y:2020 | 06 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $178 | $0 | Implemented |
UA0227 # 01 Y:2020 | 01 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,028 | $2,600 | Not Implemented |
UA0227 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,466 | $1,345 | Implemented |
UA0227 # 03 Y:2020 | 03 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $19,527 | $250 | Not Implemented |
UA0227 # 04 Y:2020 | 04 | 2020 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $65,276 | $72,800 | Implemented |
UA0227 # 05 Y:2020 | 05 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $45,805 | $100,000 | Not Implemented |
UA0227 # 06 Y:2020 | 06 | 2020 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $3,578 | $200 | Not Implemented |
UA0227 # 07 Y:2020 | 07 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,570 | $5,639 | Implemented |
AS0488 # 01 Y:2020 | 01 | 2020 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $118,609 | $10,790 | Implemented |
AS0488 # 02 Y:2020 | 02 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $41,944 | $27,312 | Not Implemented |
AS0488 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $2,602 | $272 | Implemented |
AS0488 # 04 Y:2020 | 04 | 2020 | INSTALL HEAT PIPES / RAISE COOLING SETPOINT | $2,344 | $36 | Implemented |
AS0488 # 05 Y:2020 | 05 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,864 | $7,653 | Implemented |
AS0488 # 06 Y:2020 | 06 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,828 | $3,940 | Not Implemented |