IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,582

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0069 # 03 Y:2004 03 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $16,545 $2,000 Implemented
UU0069 # 04 Y:2004 04 2004 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $91,960 $12,500 Not Implemented
UU0069 # 05 Y:2004 05 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $34,560 $0 Implemented
UU0069 # 06 Y:2004 06 2004 ELIMINATE/REDUCE AN OPERATION $76,000 $180,000 Not Implemented
UU0070 # 01 Y:2004 01 2004 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $1,370,474 $22,000,000 Not Implemented
UU0070 # 02 Y:2004 02 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $95,199 $0 Implemented
UU0070 # 03 Y:2004 03 2004 OPTIMIZE PLANT POWER FACTOR $16,729 $26,520 Not Implemented
UU0070 # 04 Y:2004 04 2004 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER $73,401 $750,000 Implemented
UU0070 # 05 Y:2004 05 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $70,000 $18,000 Implemented
UU0068 # 01 Y:2004 01 2004 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $21,193 $325 Implemented
UU0068 # 02 Y:2004 02 2004 RECOVER WASTE HEAT FROM EQUIPMENT $8,711 $3,315 Not Implemented
UU0068 # 03 Y:2004 03 2004 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,381 $7,500 Not Implemented
UU0068 # 04 Y:2004 04 2004 RECOVER WASTE HEAT FROM EQUIPMENT $5,006 $8,929 Not Implemented
UU0068 # 05 Y:2004 05 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,004 $244 Implemented
UU0068 # 06 Y:2004 06 2004 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $12,376 $1,292 Implemented
UU0066 # 01 Y:2004 01 2004 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $2,690 $3,000 Not Implemented
UU0066 # 02 Y:2004 02 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $340 $200 Not Implemented
UU0066 # 03 Y:2004 03 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $84 $310 Implemented
UU0066 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $241 $45 Implemented
UU0066 # 05 Y:2004 05 2004 OPTIMIZE PLANT POWER FACTOR $81 $270 Not Implemented
UU0066 # 06 Y:2004 06 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $199 $80 Not Implemented
UU0066 # 07 Y:2004 07 2004 PAY BILLS ON TIME TO AVOID LATE FEES $414 $0 Implemented
UU0065 # 01 Y:2004 01 2004 OPTIMIZE PLANT POWER FACTOR $4,060 $5,520 Not Implemented
UU0065 # 02 Y:2004 02 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,450 $0 Implemented
UU0065 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,345 $1,100 Implemented