Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,500
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0289 # 02 Y:2004 | 02 | 2004 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $16,901 | $11,831 | Not Implemented |
WV0289 # 03 Y:2004 | 03 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,600 | $4,857 | Implemented |
WV0289 # 04 Y:2004 | 04 | 2004 | DEVELOP A REPAIR/REPLACE POLICY | $9,956 | $2,109 | Implemented |
WV0289 # 05 Y:2004 | 05 | 2004 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $6,230 | $1,687 | Implemented |
WV0289 # 06 Y:2004 | 06 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,338 | $19,000 | Not Implemented |
WV0289 # 07 Y:2004 | 07 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,340 | $127 | Implemented |
WV0289 # 08 Y:2004 | 08 | 2004 | INSTALL OCCUPANCY SENSORS | $3,010 | $5,938 | Not Implemented |
WV0289 # 09 Y:2004 | 09 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,993 | $250 | Implemented |
WV0289 # 10 Y:2004 | 10 | 2004 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,879 | $511 | Not Implemented |
WV0289 # 11 Y:2004 | 11 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,432 | $3,500 | Not Implemented |
WV0289 # 12 Y:2004 | 12 | 2004 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $2,170 | $103 | Implemented |
WV0289 # 13 Y:2004 | 13 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,628 | $1,119 | Not Implemented |
WV0289 # 14 Y:2004 | 14 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,227 | $1,631 | Implemented |
WV0289 # 15 Y:2004 | 15 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,365 | $0 | Implemented |
NC0279 # 01 Y:2004 | 01 | 2004 | LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE | $3,220 | $20,000 | Implemented |
NC0279 # 02 Y:2004 | 02 | 2004 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $25,415 | $25,000 | Not Implemented |
NC0279 # 03 Y:2004 | 03 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,096 | $1,875 | Implemented |
NC0279 # 04 Y:2004 | 04 | 2004 | $59,248 | $6,000 | Implemented | |
NC0279 # 05 Y:2004 | 05 | 2004 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,880 | $9,200 | Not Implemented |
NC0279 # 06 Y:2004 | 06 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $119 | $120 | Not Implemented |
NC0279 # 07 Y:2004 | 07 | 2004 | INSTALL OCCUPANCY SENSORS | $253 | $775 | Not Implemented |
NC0279 # 08 Y:2004 | 08 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $68 | $80 | Not Implemented |
WV0283 # 01 Y:2004 | 01 | 2004 | ADJUST BURNERS FOR EFFICIENT OPERATION | $11,512 | $250 | Implemented |
WV0283 # 02 Y:2004 | 02 | 2004 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $9,827 | $5,000 | Not Implemented |
WV0283 # 03 Y:2004 | 03 | 2004 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $6,964 | $86 | Implemented |