Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,708
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0643 # 05 Y:2002 | 05 | 2002 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $36,000 | $384 | Not Implemented |
OK0643 # 06 Y:2002 | 06 | 2002 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $117,500 | $4,800 | Implemented |
OK0643 # 07 Y:2002 | 07 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,970 | $300 | Implemented |
OK0644 # 01 Y:2002 | 01 | 2002 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $190 | $280 | Not Implemented |
OK0644 # 02 Y:2002 | 02 | 2002 | INSTALL SPECTRAL REFLECTORS / DELAMP | $570 | $3 | Implemented |
OK0644 # 03 Y:2002 | 03 | 2002 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,441 | $1,738 | Implemented |
OK0644 # 04 Y:2002 | 04 | 2002 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,779 | $5,835 | Not Implemented |
OK0644 # 05 Y:2002 | 05 | 2002 | INSTALL AUTOMATIC PACKING EQUIPMENT | $223,374 | $103,500 | Not Implemented |
NC0250 # 01 Y:2002 | 01 | 2002 | MAKE ICE DURING OFF PEAK HOURS FOR COOLING | $13,524 | $16,000 | n/a |
NC0250 # 02 Y:2002 | 02 | 2002 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $37,000 | $12,000 | n/a |
NC0250 # 03 Y:2002 | 03 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $11,259 | $20,000 | Not Implemented |
NC0250 # 04 Y:2002 | 04 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $12,244 | $12,245 | Not Implemented |
NC0250 # 05 Y:2002 | 05 | 2002 | AIR CONDITION ONLY SPACE NECESSARY | $65,851 | $10,750 | Not Implemented |
NC0250 # 06 Y:2002 | 06 | 2002 | INSTALL BACK-UP EQUIPMENT | $13,440 | $35,000 | Not Implemented |
NC0250 # 07 Y:2002 | 07 | 2002 | DEVELOP A REPAIR/REPLACE POLICY | $798 | $1,293 | Not Implemented |
NC0250 # 08 Y:2002 | 08 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $322 | $921 | Not Implemented |
NC0250 # 09 Y:2002 | 09 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,251 | $420 | Implemented |
WV0251 # 01 Y:2002 | 01 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,178 | $630 | Implemented |
WV0251 # 02 Y:2002 | 02 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,295 | $180 | Implemented |
WV0251 # 03 Y:2002 | 03 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,218 | $0 | Implemented |
WV0251 # 04 Y:2002 | 04 | 2002 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $2,860 | $948 | Implemented |
WV0251 # 05 Y:2002 | 05 | 2002 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $13,680 | $3,000 | Not Implemented |
WV0251 # 06 Y:2002 | 06 | 2002 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $6,786 | $600 | Implemented |
WV0251 # 07 Y:2002 | 07 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,709 | $180 | Implemented |
WV0251 # 08 Y:2002 | 08 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,964 | $8,610 | Implemented |