IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,394

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0307 # 15 Y:2004 15 2004 ELIMINATE PRACTICE OF MIXING WASTE STREAMS $75 $0 Not Implemented
CO0552 # 01 Y:2004 01 2004 INSULATE BARE EQUIPMENT $47,960 $7,780 Not Implemented
CO0552 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,570 $620 Implemented
CO0552 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,520 $270 Not Implemented
CO0552 # 04 Y:2004 04 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $834 $560 Implemented
CO0552 # 05 Y:2004 05 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,500 $3,050 Implemented
CO0552 # 06 Y:2004 06 2004 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $14,250 $71,200 Not Implemented
CO0552 # 07 Y:2004 07 2004 RECOVER AND REUSE COOLING WATER $4,170 $20,000 Not Implemented
CO0552 # 08 Y:2004 08 2004 INSTALL OCCUPANCY SENSORS $950 $2,800 Not Implemented
CO0551 # 01 Y:2004 01 2004 RECOVER WASTE HEAT FROM EQUIPMENT $1,340 $4,280 Not Implemented
CO0551 # 02 Y:2004 02 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,230 $60 Implemented
CO0551 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $910 $320 Implemented
CO0551 # 04 Y:2004 04 2004 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $190 $750 Not Implemented
CO0551 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,300 $13,550 Not Implemented
CO0551 # 06 Y:2004 06 2004 INSTALL OCCUPANCY SENSORS $510 $300 Not Implemented
CO0551 # 07 Y:2004 07 2004 INSTALL OCCUPANCY SENSORS $140 $390 Not Implemented
IA0347 # 01 Y:2004 01 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,115 $14 Not Implemented
IA0347 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,623 $920 Implemented
IA0347 # 03 Y:2004 03 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,243 $1,090 Implemented
IA0347 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,608 $2,591 Implemented
IA0347 # 05 Y:2004 05 2004 INSTALL OCCUPANCY SENSORS $1,911 $1,820 Implemented
IA0347 # 06 Y:2004 06 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $929 $457 Implemented
IA0347 # 07 Y:2004 07 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $3,967 $148 Implemented
IA0347 # 08 Y:2004 08 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $29,440 $50,000 Not Implemented
IA0347 # 09 Y:2004 09 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $244 $0 Implemented