Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,295
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0825 # 01 Y:2021 | 01 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,860 | $5,000 | Implemented |
AM0825 # 02 Y:2021 | 02 | 2021 | TURN OFF EQUIPMENT WHEN NOT IN USE | $8,900 | $0 | Not Implemented |
AM0825 # 03 Y:2021 | 03 | 2021 | ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM | $8,070 | $4,250 | Implemented |
AM0825 # 04 Y:2021 | 04 | 2021 | USE SYNTHETIC LUBRICANT | $2,400 | $300 | Not Implemented |
AM0825 # 05 Y:2021 | 05 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,310 | $45 | Not Implemented |
OK1051 # 01 Y:2021 | 01 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,640 | $7,393 | Implemented |
OK1051 # 02 Y:2021 | 02 | 2021 | OPTIMIZE PLANT POWER FACTOR | $8,210 | $4,500 | Not Implemented |
OK1051 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,614 | $677 | Implemented |
OK1051 # 04 Y:2021 | 04 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,449 | $0 | Not Implemented |
LE0510 # 01 Y:2021 | 01 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $42,017 | $17,100 | Implemented |
LE0510 # 02 Y:2021 | 02 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $47,926 | $45,000 | Implemented |
LE0510 # 03 Y:2021 | 03 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $31,951 | $30,000 | Implemented |
LE0510 # 04 Y:2021 | 04 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $19,170 | $21,000 | Implemented |
LE0510 # 05 Y:2021 | 05 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $19,596 | $33,000 | Not Implemented |
LE0510 # 06 Y:2021 | 06 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,899 | $12,800 | Implemented |
LE0510 # 07 Y:2021 | 07 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $22,653 | $100,000 | Implemented |
LE0510 # 08 Y:2021 | 08 | 2021 | REPLACE BOILER | $334,294 | $1,800,000 | Implemented |
LE0510 # 09 Y:2021 | 09 | 2021 | USE SOLAR HEAT TO MAKE ELECTRICTY | $1,245,175 | $9,990,000 | Not Implemented |
MA0825 # 01 Y:2021 | 01 | 2021 | OPTIMIZE PLANT POWER FACTOR | $93,702 | $30,000 | Implemented |
MA0825 # 02 Y:2021 | 02 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $54,067 | $150,000 | Implemented |
MA0825 # 03 Y:2021 | 03 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $41,012 | $52,945 | Implemented |
MA0825 # 04 Y:2021 | 04 | 2021 | INSTALL TIMERS AND/OR THERMOSTATS | $35,925 | $3,200 | Not Implemented |
MA0825 # 05 Y:2021 | 05 | 2021 | MINIMIZE WATER USAGE | $24,897 | $6,250 | Implemented |
UU0187 # 01 Y:2021 | 01 | 2021 | OPTIMIZE PLANT POWER FACTOR | $9,400 | $14,500 | Not Implemented |
UU0187 # 02 Y:2021 | 02 | 2021 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $1,910 | $10,200 | Not Implemented |