IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,295

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0825 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,860 $5,000 Implemented
AM0825 # 02 Y:2021 02 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $8,900 $0 Not Implemented
AM0825 # 03 Y:2021 03 2021 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $8,070 $4,250 Implemented
AM0825 # 04 Y:2021 04 2021 USE SYNTHETIC LUBRICANT $2,400 $300 Not Implemented
AM0825 # 05 Y:2021 05 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,310 $45 Not Implemented
OK1051 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,640 $7,393 Implemented
OK1051 # 02 Y:2021 02 2021 OPTIMIZE PLANT POWER FACTOR $8,210 $4,500 Not Implemented
OK1051 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,614 $677 Implemented
OK1051 # 04 Y:2021 04 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,449 $0 Not Implemented
LE0510 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $42,017 $17,100 Implemented
LE0510 # 02 Y:2021 02 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $47,926 $45,000 Implemented
LE0510 # 03 Y:2021 03 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $31,951 $30,000 Implemented
LE0510 # 04 Y:2021 04 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,170 $21,000 Implemented
LE0510 # 05 Y:2021 05 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,596 $33,000 Not Implemented
LE0510 # 06 Y:2021 06 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,899 $12,800 Implemented
LE0510 # 07 Y:2021 07 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,653 $100,000 Implemented
LE0510 # 08 Y:2021 08 2021 REPLACE BOILER $334,294 $1,800,000 Implemented
LE0510 # 09 Y:2021 09 2021 USE SOLAR HEAT TO MAKE ELECTRICTY $1,245,175 $9,990,000 Not Implemented
MA0825 # 01 Y:2021 01 2021 OPTIMIZE PLANT POWER FACTOR $93,702 $30,000 Implemented
MA0825 # 02 Y:2021 02 2021 RECOVER WASTE HEAT FROM EQUIPMENT $54,067 $150,000 Implemented
MA0825 # 03 Y:2021 03 2021 RECOVER WASTE HEAT FROM EQUIPMENT $41,012 $52,945 Implemented
MA0825 # 04 Y:2021 04 2021 INSTALL TIMERS AND/OR THERMOSTATS $35,925 $3,200 Not Implemented
MA0825 # 05 Y:2021 05 2021 MINIMIZE WATER USAGE $24,897 $6,250 Implemented
UU0187 # 01 Y:2021 01 2021 OPTIMIZE PLANT POWER FACTOR $9,400 $14,500 Not Implemented
UU0187 # 02 Y:2021 02 2021 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,910 $10,200 Not Implemented