IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,102

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MUCM20 # 02 Y:2024 02 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $318 $349 n/a
MUCM20 # 03 Y:2024 03 2024 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $124 $0 n/a
MUCM20 # 04 Y:2024 04 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $7 $0 n/a
MUCM20 # 05 Y:2024 05 2024 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $35 $124 n/a
MUCM20 # 06 Y:2024 06 2024 ELIMINATE/REDUCE AN OPERATION $178 $0 n/a
UF0619 # 01 Y:2024 01 2024 USE DEMAND CONTROLLER OR LOAD SHEDDER $16,482 $6,000 n/a
UF0619 # 02 Y:2024 02 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $11,318 $25,440 n/a
UF0619 # 03 Y:2024 03 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,655 $13,445 n/a
UF0619 # 04 Y:2024 04 2024 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $7,989 $36,000 n/a
UF0619 # 05 Y:2024 05 2024 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $3,458 $9,470 n/a
UF0619 # 06 Y:2024 06 2024 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $1,257 $5,940 n/a
UF0619 # 07 Y:2024 07 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,007 $0 n/a
UF0619 # 08 Y:2024 08 2024 UPGRADE CONTROLS ON COMPRESSORS $705 $1,252 n/a
UF0619 # 09 Y:2024 09 2024 AUTOMATE FINISHING PROCESS $315,000 $181,056 n/a
UF0619 # 10 Y:2024 10 2024 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $300,000 $183,056 n/a
NL0094 # 01 Y:2024 01 2024 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $72,558 $568,000 n/a
NL0094 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,784 $4,500 n/a
NL0094 # 03 Y:2024 03 2024 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,003 $2,741 n/a
NL0094 # 04 Y:2024 04 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $731 $2,110 n/a
NL0094 # 05 Y:2024 05 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $635 $583 n/a
NL0094 # 06 Y:2024 06 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $332 $160 n/a
NL0094 # 07 Y:2024 07 2024 USE PHOTOCELL CONTROLS $196 $97 n/a
SU0554 # 01 Y:2024 01 2024 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $19,596 $0 n/a
SU0554 # 02 Y:2024 02 2024 PAY BILLS ON TIME TO AVOID LATE FEES $1,907 $0 n/a
SU0554 # 03 Y:2024 03 2024 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $124 $0 n/a