Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
122,146
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0155 # 13 Y:1985 | 13 | 1985 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $434 | $0 | Not Implemented |
KU0155 # 14 Y:1985 | 14 | 1985 | USE RADIANT HEATER FOR SPOT HEATING | $112 | $25 | Not Implemented |
KU0155 # 15 Y:1985 | 15 | 1985 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $393 | $0 | Implemented |
KU0155 # 16 Y:1985 | 16 | 1985 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $150 | $0 | Implemented |
KU0156 # 01 Y:1985 | 01 | 1985 | BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT | $93,873 | $350,000 | Not Implemented |
KU0156 # 02 Y:1985 | 02 | 1985 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $9,544 | $3,342 | Implemented |
KU0156 # 03 Y:1985 | 03 | 1985 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $6,350 | $2,500 | Not Implemented |
KU0156 # 04 Y:1985 | 04 | 1985 | REPLACE STEAM JETS ON VACUUM SYSTEM WITH ELECTRIC MOTOR DRIVEN VACUUM PUMPS | $1,428 | $2,000 | Not Implemented |
KU0156 # 05 Y:1985 | 05 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $8,064 | $2,200 | Implemented |
KU0156 # 06 Y:1985 | 06 | 1985 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $5,611 | $1,200 | Implemented |
KU0156 # 07 Y:1985 | 07 | 1985 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $6,298 | $1,200 | Implemented |
KU0156 # 08 Y:1985 | 08 | 1985 | INSULATE BARE EQUIPMENT | $311 | $187 | Not Implemented |
KU0156 # 09 Y:1985 | 09 | 1985 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,323 | $0 | Not Implemented |
KU0156 # 10 Y:1985 | 10 | 1985 | ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE | $239 | $0 | Not Implemented |
KU0156 # 11 Y:1985 | 11 | 1985 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $141 | $40 | Not Implemented |
MA0020 # 01 Y:1985 | 01 | 1985 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $11,592 | $6,000 | Implemented |
MA0020 # 02 Y:1985 | 02 | 1985 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $9,754 | $56,300 | Implemented |
MA0020 # 03 Y:1985 | 03 | 1985 | USE RADIANT HEATER FOR SPOT HEATING | $4,696 | $13,000 | Not Implemented |
MA0020 # 04 Y:1985 | 04 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $852 | $100 | Implemented |
GT0247 # 01 Y:1985 | 01 | 1985 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $613 | $562 | Implemented |
GT0247 # 02 Y:1985 | 02 | 1985 | INSTALL SET-BACK TIMERS | $1,091 | $0 | Not Implemented |
GT0247 # 03 Y:1985 | 03 | 1985 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $6,199 | $0 | Implemented |
GT0247 # 04 Y:1985 | 04 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,042 | $150 | Implemented |
GT0247 # 05 Y:1985 | 05 | 1985 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $859 | $1,000 | Implemented |
GT0248 # 01 Y:1985 | 01 | 1985 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $722 | $581 | Implemented |