IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,996

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0626 # 04 Y:1997 04 1997 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $2,730 $1,420 Not Implemented
GT0626 # 05 Y:1997 05 1997 INSTALL / REPAIR INSULATION ON STEAM LINES $400 $620 Implemented
GT0626 # 06 Y:1997 06 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,570 $7,580 Not Implemented
GT0626 # 07 Y:1997 07 1997 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $26,666 $4,200 Implemented
GT0626 # 08 Y:1997 08 1997 USE A DIFFERENT OR RECYCLED RAW MATERIAL $1,315 $438 Not Implemented
ND0291 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,825 $3,400 Implemented
ND0291 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,398 $1,350 Implemented
ND0291 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,285 $348 Implemented
ND0291 # 04 Y:1997 04 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $443 $40 Not Implemented
ND0291 # 05 Y:1997 05 1997 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $306 $360 Not Implemented
ND0291 # 06 Y:1997 06 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $287 $0 Implemented
ND0291 # 07 Y:1997 07 1997 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $257 $96 Not Implemented
ND0291 # 08 Y:1997 08 1997 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $170 $0 Implemented
ND0291 # 09 Y:1997 09 1997 USE ALTERNATIVES FOR ACIDS / ALKALINE (WATER, STEAM, ABRASIVE) $128 $100 Not Implemented
ND0291 # 10 Y:1997 10 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $99 $100 Implemented
ND0291 # 11 Y:1997 11 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $89 $20 Implemented
ND0291 # 12 Y:1997 12 1997 TURN OFF EQUIPMENT WHEN NOT IN USE $5 $73 Not Implemented
MS0097 # 01 Y:1997 01 1997 USE OPTIMUM THICKNESS INSULATION $78,996 $81,321 Not Implemented
MS0097 # 02 Y:1997 02 1997 OPTIMIZE PLANT POWER FACTOR $4,746 $1,326 Implemented
MS0097 # 03 Y:1997 03 1997 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $828 $482 Not Implemented
MS0097 # 04 Y:1997 04 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,896 $8,648 Implemented
MS0097 # 05 Y:1997 05 1997 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $5,931 $1,158 Implemented
MS0097 # 06 Y:1997 06 1997 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $26,125 $32,289 Implemented
SF0125 # 01 Y:1997 01 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,159 $1,246 Not Implemented
SF0125 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,650 $16,860 Implemented