Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,333
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0201 # 03 Y:2000 | 03 | 2000 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $23,492 | $19,738 | Implemented |
SF0201 # 04 Y:2000 | 04 | 2000 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $15,456 | $15,452 | Not Implemented |
SF0201 # 05 Y:2000 | 05 | 2000 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $7,180 | $11,750 | Not Implemented |
SF0201 # 06 Y:2000 | 06 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,796 | $8,825 | Implemented |
SF0201 # 07 Y:2000 | 07 | 2000 | RECOVER AND REUSE WASTE MATERIAL | $12,259 | $7,650 | Implemented |
SF0201 # 08 Y:2000 | 08 | 2000 | RECOVER AND REUSE WASTE MATERIAL | $1,635 | $0 | Implemented |
SF0201 # 09 Y:2000 | 09 | 2000 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $24,638 | $18,750 | Not Implemented |
UM0171 # 01 Y:2000 | 01 | 2000 | INSTALL OCCUPANCY SENSORS | $717 | $3,440 | Not Implemented |
UM0171 # 02 Y:2000 | 02 | 2000 | USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION | $15,476 | $30,000 | Not Implemented |
UM0171 # 03 Y:2000 | 03 | 2000 | REDUCE EXCESSIVE BOILER BLOWDOWN | $2,065 | $4,430 | Not Implemented |
UM0171 # 04 Y:2000 | 04 | 2000 | USE OTHER WASTE CONCENTRATION METHODS | $147,018 | $250,000 | Not Implemented |
UM0171 # 05 Y:2000 | 05 | 2000 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $32,105 | $3,600 | Not Implemented |
UM0171 # 06 Y:2000 | 06 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $187,954 | $165,000 | Implemented |
WI0382 # 01 Y:2000 | 01 | 2000 | REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF | $11,648 | $23,400 | Not Implemented |
WI0382 # 02 Y:2000 | 02 | 2000 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $850 | $2,000 | Not Implemented |
WI0382 # 03 Y:2000 | 03 | 2000 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $11,276 | $34,000 | Not Implemented |
WI0382 # 04 Y:2000 | 04 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $6,099 | $1,680 | Not Implemented |
WI0382 # 05 Y:2000 | 05 | 2000 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $5,144 | $0 | Implemented |
WI0382 # 06 Y:2000 | 06 | 2000 | INSTALL OCCUPANCY SENSORS | $3,123 | $7,200 | Not Implemented |
WI0382 # 07 Y:2000 | 07 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,081 | $6,484 | Implemented |
WI0382 # 08 Y:2000 | 08 | 2000 | DISTILL CONTAMINATED SOLVENTS FOR REUSE | $2,899 | $5,700 | Not Implemented |
WI0382 # 09 Y:2000 | 09 | 2000 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,250 | $1,400 | Not Implemented |
BD0169 # 01 Y:2000 | 01 | 2000 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $9,339 | $13,140 | Not Implemented |
BD0169 # 02 Y:2000 | 02 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,421 | $700 | Implemented |
BD0169 # 03 Y:2000 | 03 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,564 | $2,000 | Not Implemented |