IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,333

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0201 # 03 Y:2000 03 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $23,492 $19,738 Implemented
SF0201 # 04 Y:2000 04 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $15,456 $15,452 Not Implemented
SF0201 # 05 Y:2000 05 2000 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $7,180 $11,750 Not Implemented
SF0201 # 06 Y:2000 06 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,796 $8,825 Implemented
SF0201 # 07 Y:2000 07 2000 RECOVER AND REUSE WASTE MATERIAL $12,259 $7,650 Implemented
SF0201 # 08 Y:2000 08 2000 RECOVER AND REUSE WASTE MATERIAL $1,635 $0 Implemented
SF0201 # 09 Y:2000 09 2000 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $24,638 $18,750 Not Implemented
UM0171 # 01 Y:2000 01 2000 INSTALL OCCUPANCY SENSORS $717 $3,440 Not Implemented
UM0171 # 02 Y:2000 02 2000 USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION $15,476 $30,000 Not Implemented
UM0171 # 03 Y:2000 03 2000 REDUCE EXCESSIVE BOILER BLOWDOWN $2,065 $4,430 Not Implemented
UM0171 # 04 Y:2000 04 2000 USE OTHER WASTE CONCENTRATION METHODS $147,018 $250,000 Not Implemented
UM0171 # 05 Y:2000 05 2000 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $32,105 $3,600 Not Implemented
UM0171 # 06 Y:2000 06 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $187,954 $165,000 Implemented
WI0382 # 01 Y:2000 01 2000 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $11,648 $23,400 Not Implemented
WI0382 # 02 Y:2000 02 2000 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $850 $2,000 Not Implemented
WI0382 # 03 Y:2000 03 2000 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $11,276 $34,000 Not Implemented
WI0382 # 04 Y:2000 04 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,099 $1,680 Not Implemented
WI0382 # 05 Y:2000 05 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $5,144 $0 Implemented
WI0382 # 06 Y:2000 06 2000 INSTALL OCCUPANCY SENSORS $3,123 $7,200 Not Implemented
WI0382 # 07 Y:2000 07 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,081 $6,484 Implemented
WI0382 # 08 Y:2000 08 2000 DISTILL CONTAMINATED SOLVENTS FOR REUSE $2,899 $5,700 Not Implemented
WI0382 # 09 Y:2000 09 2000 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,250 $1,400 Not Implemented
BD0169 # 01 Y:2000 01 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,339 $13,140 Not Implemented
BD0169 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,421 $700 Implemented
BD0169 # 03 Y:2000 03 2000 RECOVER WASTE HEAT FROM EQUIPMENT $1,564 $2,000 Not Implemented