Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,874
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0521 # 02 Y:2003 | 02 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,840 | $5,100 | Not Implemented |
CO0521 # 03 Y:2003 | 03 | 2003 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $2,010 | $1,400 | Implemented |
CO0521 # 04 Y:2003 | 04 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,000 | $200 | Implemented |
CO0521 # 05 Y:2003 | 05 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,650 | $3,532 | Not Implemented |
CO0521 # 06 Y:2003 | 06 | 2003 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $48,290 | $175,000 | Not Implemented |
CO0523 # 01 Y:2003 | 01 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $19,740 | $12,000 | Not Implemented |
CO0523 # 02 Y:2003 | 02 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,270 | $19,440 | Not Implemented |
CO0523 # 03 Y:2003 | 03 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,990 | $230 | Implemented |
CO0523 # 04 Y:2003 | 04 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,122 | $12,500 | Not Implemented |
CO0523 # 05 Y:2003 | 05 | 2003 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $4,120 | $11,840 | Not Implemented |
CO0523 # 06 Y:2003 | 06 | 2003 | REPAIR AND ELIMINATE STEAM LEAKS | $1,130 | $210 | Implemented |
CO0523 # 07 Y:2003 | 07 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $144 | $266 | Not Implemented |
CO0523 # 08 Y:2003 | 08 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $210 | $490 | Not Implemented |
CO0522 # 01 Y:2003 | 01 | 2003 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $9,140 | $10,660 | Not Implemented |
CO0522 # 02 Y:2003 | 02 | 2003 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $4,420 | $10,000 | Not Implemented |
CO0522 # 03 Y:2003 | 03 | 2003 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $4,300 | $840 | Not Implemented |
CO0522 # 04 Y:2003 | 04 | 2003 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,870 | $1,950 | Not Implemented |
CO0522 # 05 Y:2003 | 05 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $170 | $414 | Not Implemented |
CO0522 # 06 Y:2003 | 06 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $184 | $308 | Not Implemented |
CO0520 # 01 Y:2003 | 01 | 2003 | USE POWER DURING OFF-PEAK PERIODS | $12,470 | $10,000 | Not Implemented |
CO0520 # 02 Y:2003 | 02 | 2003 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $10,530 | $39,900 | Not Implemented |
CO0520 # 03 Y:2003 | 03 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $304 | $508 | Not Implemented |
CO0520 # 04 Y:2003 | 04 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,460 | $260 | Implemented |
CO0520 # 05 Y:2003 | 05 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $410 | $260 | Not Implemented |
CO0511 # 01 Y:2002 | 01 | 2002 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $12,040 | $9,500 | Not Implemented |