IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,582

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0060 # 04 Y:2004 04 2004 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $3,047 $2,600 Not Implemented
UU0060 # 05 Y:2004 05 2004 INSULATE BARE EQUIPMENT $309 $723 Not Implemented
UU0060 # 06 Y:2004 06 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,853 $0 Not Implemented
UU0060 # 07 Y:2004 07 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,897 $200 Implemented
UU0059 # 01 Y:2004 01 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $12,130 $9,651 Not Implemented
UU0059 # 02 Y:2004 02 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $20,658 $20,658 Implemented
UU0059 # 03 Y:2004 03 2004 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $23,500 $15,630 Not Implemented
UU0059 # 04 Y:2004 04 2004 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $6,386 $275 Not Implemented
UU0059 # 05 Y:2004 05 2004 INSTALL SPECTRAL REFLECTORS / DELAMP $29,485 $6,260 Implemented
UU0059 # 06 Y:2004 06 2004 INSTALL SKYLIGHTS $32,748 $272,000 Not Implemented
UU0059 # 07 Y:2004 07 2004 ISOLATE STEAM LINES TO AVOID HEATING AIR CONDITIONED AREAS $12,192 $8,860 Not Implemented
UU0058 # 01 Y:2004 01 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $54,124 $150,000 Not Implemented
UU0058 # 02 Y:2004 02 2004 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $21,233 $78,000 Not Implemented
UU0058 # 03 Y:2004 03 2004 RECOVER WASTE HEAT FROM EQUIPMENT $6,081 $5,369 Not Implemented
UU0058 # 04 Y:2004 04 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,398 $308 Not Implemented
UU0058 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,714 $1,010 Implemented
UU0058 # 06 Y:2004 06 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $14,353 $0 Implemented
UU0058 # 07 Y:2004 07 2004 COMBINE UTILITY METERS $10,270 $0 Implemented
UU0058 # 08 Y:2004 08 2004 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $584 $0 Not Implemented
UU0057 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $792 $100 Implemented
UU0057 # 02 Y:2004 02 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $829 $20 Not Implemented
UU0057 # 03 Y:2004 03 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $279 $129 Not Implemented
UU0057 # 04 Y:2004 04 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,240 $6,450 Not Implemented
UU0057 # 05 Y:2004 05 2004 INCREASE AMOUNT OF CONDENSATE RETURNED $4,493 $25,000 Not Implemented
UU0057 # 06 Y:2004 06 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,110 $2,000 Not Implemented