Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,582
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0060 # 04 Y:2004 | 04 | 2004 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $3,047 | $2,600 | Not Implemented |
UU0060 # 05 Y:2004 | 05 | 2004 | INSULATE BARE EQUIPMENT | $309 | $723 | Not Implemented |
UU0060 # 06 Y:2004 | 06 | 2004 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,853 | $0 | Not Implemented |
UU0060 # 07 Y:2004 | 07 | 2004 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $4,897 | $200 | Implemented |
UU0059 # 01 Y:2004 | 01 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $12,130 | $9,651 | Not Implemented |
UU0059 # 02 Y:2004 | 02 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $20,658 | $20,658 | Implemented |
UU0059 # 03 Y:2004 | 03 | 2004 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $23,500 | $15,630 | Not Implemented |
UU0059 # 04 Y:2004 | 04 | 2004 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $6,386 | $275 | Not Implemented |
UU0059 # 05 Y:2004 | 05 | 2004 | INSTALL SPECTRAL REFLECTORS / DELAMP | $29,485 | $6,260 | Implemented |
UU0059 # 06 Y:2004 | 06 | 2004 | INSTALL SKYLIGHTS | $32,748 | $272,000 | Not Implemented |
UU0059 # 07 Y:2004 | 07 | 2004 | ISOLATE STEAM LINES TO AVOID HEATING AIR CONDITIONED AREAS | $12,192 | $8,860 | Not Implemented |
UU0058 # 01 Y:2004 | 01 | 2004 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $54,124 | $150,000 | Not Implemented |
UU0058 # 02 Y:2004 | 02 | 2004 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $21,233 | $78,000 | Not Implemented |
UU0058 # 03 Y:2004 | 03 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,081 | $5,369 | Not Implemented |
UU0058 # 04 Y:2004 | 04 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,398 | $308 | Not Implemented |
UU0058 # 05 Y:2004 | 05 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,714 | $1,010 | Implemented |
UU0058 # 06 Y:2004 | 06 | 2004 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $14,353 | $0 | Implemented |
UU0058 # 07 Y:2004 | 07 | 2004 | COMBINE UTILITY METERS | $10,270 | $0 | Implemented |
UU0058 # 08 Y:2004 | 08 | 2004 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $584 | $0 | Not Implemented |
UU0057 # 01 Y:2004 | 01 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $792 | $100 | Implemented |
UU0057 # 02 Y:2004 | 02 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $829 | $20 | Not Implemented |
UU0057 # 03 Y:2004 | 03 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $279 | $129 | Not Implemented |
UU0057 # 04 Y:2004 | 04 | 2004 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,240 | $6,450 | Not Implemented |
UU0057 # 05 Y:2004 | 05 | 2004 | INCREASE AMOUNT OF CONDENSATE RETURNED | $4,493 | $25,000 | Not Implemented |
UU0057 # 06 Y:2004 | 06 | 2004 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,110 | $2,000 | Not Implemented |