IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,063

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0067 # 08 Y:2015 08 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,586 $1,680 Implemented
WM0067 # 09 Y:2015 09 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,111 $1,245 Not Implemented
WM0067 # 10 Y:2015 10 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,592 $640 Implemented
WM0067 # 11 Y:2015 11 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,495 $10,871 Implemented
WM0067 # 12 Y:2015 12 2015 CONTRACT A WOOD PALLET RECYCLING COMPANY $5,737 $0 Not Implemented
WM0067 # 13 Y:2015 13 2015 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $3,678 $0 Implemented
WM0067 # 14 Y:2015 14 2015 INSTALL OCCUPANCY SENSORS $731 $1,876 Not Implemented
WM0065 # 01 Y:2015 01 2015 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $23,093 $64,540 Not Implemented
WM0065 # 02 Y:2015 02 2015 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $14,101 $7,500 Not Implemented
WM0065 # 03 Y:2015 03 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,202 $22,500 Not Implemented
WM0065 # 04 Y:2015 04 2015 USE SYNTHETIC LUBRICANT $7,132 $2,146 Not Implemented
WM0065 # 05 Y:2015 05 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $2,778 $426 Not Implemented
WM0065 # 06 Y:2015 06 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,598 $6,000 Not Implemented
WM0065 # 07 Y:2015 07 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,310 $588 Not Implemented
WM0065 # 08 Y:2015 08 2015 INSTALL OCCUPANCY SENSORS $905 $160 Not Implemented
WM0065 # 09 Y:2015 09 2015 USE PHOTOCELL CONTROLS $465 $1,035 Not Implemented
WM0065 # 10 Y:2015 10 2015 INSTALL OCCUPANCY SENSORS $304 $536 Not Implemented
WM0064 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $687 $1,950 Not Implemented
WM0064 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,641 $8,621 Implemented
WM0064 # 03 Y:2015 03 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,350 $0 Not Implemented
WM0064 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,497 $1,640 Implemented
WM0064 # 05 Y:2015 05 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,738 $8,210 Not Implemented
WM0064 # 06 Y:2015 06 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,868 $3,500 Not Implemented
WM0064 # 07 Y:2015 07 2015 INSULATE BARE EQUIPMENT $11,151 $1,631 Not Implemented
WM0064 # 08 Y:2015 08 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $20,928 $34,000 Not Implemented