Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,640
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0634 # 02 Y:2001 | 02 | 2001 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,762 | $400 | Implemented |
UD0634 # 03 Y:2001 | 03 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,426 | $700 | Not Implemented |
UD0634 # 04 Y:2001 | 04 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,372 | $0 | Implemented |
UD0634 # 05 Y:2001 | 05 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,089 | $132 | Implemented |
UD0634 # 06 Y:2001 | 06 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $704 | $600 | Implemented |
UD0633 # 01 Y:2001 | 01 | 2001 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $25,095 | $6,000 | Implemented |
UD0633 # 02 Y:2001 | 02 | 2001 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $17,974 | $3,000 | Implemented |
UD0633 # 03 Y:2001 | 03 | 2001 | INSULATE BARE EQUIPMENT | $10,072 | $1,560 | Not Implemented |
UD0633 # 04 Y:2001 | 04 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,223 | $4,000 | Not Implemented |
UD0633 # 05 Y:2001 | 05 | 2001 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $4,373 | $600 | Implemented |
UD0633 # 06 Y:2001 | 06 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,155 | $5,550 | Not Implemented |
UD0633 # 07 Y:2001 | 07 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,150 | $1,750 | Implemented |
UD0633 # 08 Y:2001 | 08 | 2001 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,374 | $0 | Implemented |
UD0633 # 09 Y:2001 | 09 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,094 | $180 | Not Implemented |
AS0309 # 01 Y:2001 | 01 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,341 | $3,800 | Implemented |
AS0309 # 02 Y:2001 | 02 | 2001 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $426 | $480 | Implemented |
AS0309 # 03 Y:2001 | 03 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $305 | $60 | Implemented |
AS0309 # 04 Y:2001 | 04 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $962 | $4,006 | Implemented |
AS0309 # 05 Y:2001 | 05 | 2001 | INSTALL OCCUPANCY SENSORS | $22 | $75 | Not Implemented |
AS0309 # 06 Y:2001 | 06 | 2001 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $585 | $1,400 | Implemented |
AS0309 # 07 Y:2001 | 07 | 2001 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $5,413 | $60 | Implemented |
AS0309 # 08 Y:2001 | 08 | 2001 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $2,773 | $685 | Implemented |
BD0193 # 01 Y:2001 | 01 | 2001 | USE RADIANT HEATER FOR SPOT HEATING | $68,706 | $29,000 | Implemented |
BD0193 # 02 Y:2001 | 02 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $44,275 | $22,875 | Implemented |
BD0193 # 03 Y:2001 | 03 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,104 | $2,900 | Implemented |