IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,708

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0140 # 02 Y:2002 02 2002 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $392,475 $730,000 Not Implemented
SU0140 # 03 Y:2002 03 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $147,968 $19,500 Not Implemented
SU0140 # 04 Y:2002 04 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $35,283 $64,018 Implemented
SU0140 # 05 Y:2002 05 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $34,631 $14,250 Implemented
SU0140 # 06 Y:2002 06 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $25,122 $700 Implemented
SU0140 # 07 Y:2002 07 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $21,142 $360 Not Implemented
SU0140 # 08 Y:2002 08 2002 INSTALL / REPAIR INSULATION ON STEAM LINES $3,151 $8,733 Implemented
SU0140 # 09 Y:2002 09 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,480 $0 Implemented
SU0140 # 10 Y:2002 10 2002 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $931 $581 Not Implemented
NC0245 # 01 Y:2002 01 2002 REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT $142,297 $262,500 Not Implemented
NC0245 # 02 Y:2002 02 2002 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $7,452 $20,000 Not Implemented
NC0245 # 03 Y:2002 03 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,574 $0 Not Implemented
NC0245 # 04 Y:2002 04 2002 RECOVER WASTE HEAT FROM EQUIPMENT $3,991 $1,000 Not Implemented
NC0245 # 05 Y:2002 05 2002 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE $7,000 $6,320 Not Implemented
NC0245 # 06 Y:2002 06 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $893 $1,590 Not Implemented
NC0245 # 07 Y:2002 07 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $600 $0 Not Implemented
CO0511 # 01 Y:2002 01 2002 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $12,040 $9,500 Not Implemented
CO0511 # 02 Y:2002 02 2002 OPTIMIZE PLANT POWER FACTOR $10,160 $14,010 Not Implemented
CO0511 # 03 Y:2002 03 2002 INSULATE BARE EQUIPMENT $4,380 $990 Not Implemented
CO0511 # 04 Y:2002 04 2002 USE HEAT PUMP FOR SPACE CONDITIONING $4,020 $0 Not Implemented
CO0511 # 05 Y:2002 05 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,420 $190 Implemented
CO0511 # 06 Y:2002 06 2002 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,290 $1,200 Not Implemented
CO0511 # 07 Y:2002 07 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $370 $300 Not Implemented
CO0511 # 08 Y:2002 08 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $340 $0 Not Implemented
CO0511 # 09 Y:2002 09 2002 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $100 $0 Not Implemented