Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,708
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MS0214 # 03 Y:2002 | 03 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,766 | $288 | Implemented |
MS0214 # 04 Y:2002 | 04 | 2002 | INSTALL TIMERS AND/OR THERMOSTATS | $3,765 | $3,400 | Not Implemented |
MS0214 # 05 Y:2002 | 05 | 2002 | INSTALL SPECTRAL REFLECTORS / DELAMP | $2,288 | $270 | Implemented |
MS0214 # 06 Y:2002 | 06 | 2002 | DISCONNECT BALLASTS | $1,230 | $1,395 | Implemented |
MS0214 # 07 Y:2002 | 07 | 2002 | INSTALL TIMERS AND/OR THERMOSTATS | $1,517 | $1,416 | Not Implemented |
MS0214 # 08 Y:2002 | 08 | 2002 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $582 | $0 | Implemented |
MS0214 # 09 Y:2002 | 09 | 2002 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $557 | $200 | Implemented |
MS0214 # 10 Y:2002 | 10 | 2002 | CONVERT FROM BATCH OPERATION TO CONTINUOUS PROCESSING | $6,462 | $6,610 | Not Implemented |
MS0214 # 11 Y:2002 | 11 | 2002 | $38,952 | $153,600 | Not Implemented | |
NC0245 # 01 Y:2002 | 01 | 2002 | REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT | $142,297 | $262,500 | Not Implemented |
NC0245 # 02 Y:2002 | 02 | 2002 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $7,452 | $20,000 | Not Implemented |
NC0245 # 03 Y:2002 | 03 | 2002 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,574 | $0 | Not Implemented |
NC0245 # 04 Y:2002 | 04 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,991 | $1,000 | Not Implemented |
NC0245 # 05 Y:2002 | 05 | 2002 | $7,000 | $6,320 | Not Implemented | |
NC0245 # 06 Y:2002 | 06 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $893 | $1,590 | Not Implemented |
NC0245 # 07 Y:2002 | 07 | 2002 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $600 | $0 | Not Implemented |
MA0521 # 01 Y:2002 | 01 | 2002 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $27,097 | $34,000 | Implemented |
MA0521 # 02 Y:2002 | 02 | 2002 | ADJUST BURNERS FOR EFFICIENT OPERATION | $16,316 | $4,800 | Implemented |
MA0521 # 03 Y:2002 | 03 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,066 | $7,675 | Implemented |
MA0521 # 04 Y:2002 | 04 | 2002 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $2,717 | $360 | Implemented |
MA0521 # 05 Y:2002 | 05 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $311 | $1,000 | Not Implemented |
CO0511 # 01 Y:2002 | 01 | 2002 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $12,040 | $9,500 | Not Implemented |
CO0511 # 02 Y:2002 | 02 | 2002 | OPTIMIZE PLANT POWER FACTOR | $10,160 | $14,010 | Not Implemented |
CO0511 # 03 Y:2002 | 03 | 2002 | INSULATE BARE EQUIPMENT | $4,380 | $990 | Not Implemented |
CO0511 # 04 Y:2002 | 04 | 2002 | USE HEAT PUMP FOR SPACE CONDITIONING | $4,020 | $0 | Not Implemented |