Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,708
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0140 # 02 Y:2002 | 02 | 2002 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $392,475 | $730,000 | Not Implemented |
SU0140 # 03 Y:2002 | 03 | 2002 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $147,968 | $19,500 | Not Implemented |
SU0140 # 04 Y:2002 | 04 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $35,283 | $64,018 | Implemented |
SU0140 # 05 Y:2002 | 05 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $34,631 | $14,250 | Implemented |
SU0140 # 06 Y:2002 | 06 | 2002 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $25,122 | $700 | Implemented |
SU0140 # 07 Y:2002 | 07 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $21,142 | $360 | Not Implemented |
SU0140 # 08 Y:2002 | 08 | 2002 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,151 | $8,733 | Implemented |
SU0140 # 09 Y:2002 | 09 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,480 | $0 | Implemented |
SU0140 # 10 Y:2002 | 10 | 2002 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $931 | $581 | Not Implemented |
NC0245 # 01 Y:2002 | 01 | 2002 | REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT | $142,297 | $262,500 | Not Implemented |
NC0245 # 02 Y:2002 | 02 | 2002 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $7,452 | $20,000 | Not Implemented |
NC0245 # 03 Y:2002 | 03 | 2002 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,574 | $0 | Not Implemented |
NC0245 # 04 Y:2002 | 04 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,991 | $1,000 | Not Implemented |
NC0245 # 05 Y:2002 | 05 | 2002 | INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE | $7,000 | $6,320 | Not Implemented |
NC0245 # 06 Y:2002 | 06 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $893 | $1,590 | Not Implemented |
NC0245 # 07 Y:2002 | 07 | 2002 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $600 | $0 | Not Implemented |
CO0511 # 01 Y:2002 | 01 | 2002 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $12,040 | $9,500 | Not Implemented |
CO0511 # 02 Y:2002 | 02 | 2002 | OPTIMIZE PLANT POWER FACTOR | $10,160 | $14,010 | Not Implemented |
CO0511 # 03 Y:2002 | 03 | 2002 | INSULATE BARE EQUIPMENT | $4,380 | $990 | Not Implemented |
CO0511 # 04 Y:2002 | 04 | 2002 | USE HEAT PUMP FOR SPACE CONDITIONING | $4,020 | $0 | Not Implemented |
CO0511 # 05 Y:2002 | 05 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,420 | $190 | Implemented |
CO0511 # 06 Y:2002 | 06 | 2002 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,290 | $1,200 | Not Implemented |
CO0511 # 07 Y:2002 | 07 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $370 | $300 | Not Implemented |
CO0511 # 08 Y:2002 | 08 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $340 | $0 | Not Implemented |
CO0511 # 09 Y:2002 | 09 | 2002 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $100 | $0 | Not Implemented |