IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,230

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0431 # 06 Y:2011 06 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $193 $100 Implemented
NC0431 # 07 Y:2011 07 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $280 $0 Implemented
TT0074 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,855 $61,400 Implemented
TT0074 # 02 Y:2011 02 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,100 $5,000 Implemented
TT0074 # 03 Y:2011 03 2011 INSULATE BARE EQUIPMENT $48,800 $37,500 Implemented
TT0074 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $25,250 $7,500 Not Implemented
TT0074 # 05 Y:2011 05 2011 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $52,200 $95,100 Not Implemented
TT0074 # 06 Y:2011 06 2011 RECOVER WASTE HEAT FROM EQUIPMENT $6,100 $12,000 Not Implemented
TT0074 # 07 Y:2011 07 2011 OPTIMIZE PLANT POWER FACTOR $10,300 $21,000 Not Implemented
UD0841 # 01 Y:2011 01 2011 OPTIMIZE PLANT POWER FACTOR $8,191 $20,000 Not Implemented
UD0841 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $88,915 $80,000 Implemented
UD0841 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $50,283 $40,000 Implemented
UD0841 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,101 $30,000 Implemented
UD0841 # 05 Y:2011 05 2011 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $43,664 $0 Implemented
UD0841 # 06 Y:2011 06 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $29,362 $500 Implemented
UD0841 # 07 Y:2011 07 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $22,760 $500 Not Implemented
UD0841 # 08 Y:2011 08 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,228 $18,342 Not Implemented
UD0841 # 09 Y:2011 09 2011 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $1,228 $750 Not Implemented
UD0841 # 10 Y:2011 10 2011 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $42,803 $110,624 Implemented
UD0841 # 11 Y:2011 11 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $65,429 $1,000 Not Implemented
UD0841 # 12 Y:2011 12 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $11,884 $56,000 Not Implemented
UD0841 # 13 Y:2011 13 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $417 $1,012 Implemented
UD0841 # 14 Y:2011 14 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $64,796 $20,000 Implemented
UD0841 # 15 Y:2011 15 2011 ISOLATE HOT OR COLD EQUIPMENT $33,356 $2,000 Implemented
UD0841 # 16 Y:2011 16 2011 INSTALL AUTOMATIC STACK DAMPER $20,178 $500 Not Implemented