IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,485

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0228 # 03 Y:2019 03 2019 INSTALL TIMERS AND/OR THERMOSTATS $1,880 $100 Implemented
TT0228 # 04 Y:2019 04 2019 USE RADIANT HEATER FOR SPOT HEATING $1,438 $1,100 Not Implemented
TT0228 # 05 Y:2019 05 2019 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,351 $1,100 Implemented
NL0037 # 01 Y:2019 01 2019 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $59,550 $111,550 Not Implemented
NL0037 # 02 Y:2019 02 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,092 $690 Not Implemented
NL0037 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,899 $2,807 Not Implemented
NL0037 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $130 $46 Not Implemented
SU0483 # 01 Y:2019 01 2019 PAY BILLS ON TIME TO AVOID LATE FEES $1,917 $0 Implemented
SU0483 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $498 $0 Implemented
SU0483 # 03 Y:2019 03 2019 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $8,883 $264 Implemented
SU0483 # 04 Y:2019 04 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $975 $90 Implemented
SU0483 # 05 Y:2019 05 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,947 $624 Implemented
SU0483 # 06 Y:2019 06 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $86 $49 Implemented
SU0483 # 07 Y:2019 07 2019 ELIMINATE/REDUCE AN OPERATION $4,545 $2,937 Implemented
SU0483 # 08 Y:2019 08 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $397 $576 Implemented
SU0483 # 09 Y:2019 09 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,136 $5,186 Implemented
SU0483 # 10 Y:2019 10 2019 USE PHOTOCELL CONTROLS $256 $460 Implemented
SU0483 # 11 Y:2019 11 2019 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $110 $357 Not Implemented
SU0483 # 12 Y:2019 12 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $48 $163 Not Implemented
UF0533 # 01 Y:2019 01 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $53,828 $109,400 Implemented
UF0533 # 02 Y:2019 02 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $42,877 $213,770 Implemented
UF0533 # 03 Y:2019 03 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $20,145 $54,910 Implemented
UF0533 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,617 $472 Implemented
UF0533 # 05 Y:2019 05 2019 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $1,160 $4,000 Implemented
UF0533 # 06 Y:2019 06 2019 RECOVER AND REUSE WASTE MATERIAL $396,790 $810,000 Implemented