Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,485
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0228 # 03 Y:2019 | 03 | 2019 | INSTALL TIMERS AND/OR THERMOSTATS | $1,880 | $100 | Implemented |
TT0228 # 04 Y:2019 | 04 | 2019 | USE RADIANT HEATER FOR SPOT HEATING | $1,438 | $1,100 | Not Implemented |
TT0228 # 05 Y:2019 | 05 | 2019 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $1,351 | $1,100 | Implemented |
NL0037 # 01 Y:2019 | 01 | 2019 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $59,550 | $111,550 | Not Implemented |
NL0037 # 02 Y:2019 | 02 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $21,092 | $690 | Not Implemented |
NL0037 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,899 | $2,807 | Not Implemented |
NL0037 # 04 Y:2019 | 04 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $130 | $46 | Not Implemented |
SU0483 # 01 Y:2019 | 01 | 2019 | PAY BILLS ON TIME TO AVOID LATE FEES | $1,917 | $0 | Implemented |
SU0483 # 02 Y:2019 | 02 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $498 | $0 | Implemented |
SU0483 # 03 Y:2019 | 03 | 2019 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $8,883 | $264 | Implemented |
SU0483 # 04 Y:2019 | 04 | 2019 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $975 | $90 | Implemented |
SU0483 # 05 Y:2019 | 05 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,947 | $624 | Implemented |
SU0483 # 06 Y:2019 | 06 | 2019 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $86 | $49 | Implemented |
SU0483 # 07 Y:2019 | 07 | 2019 | ELIMINATE/REDUCE AN OPERATION | $4,545 | $2,937 | Implemented |
SU0483 # 08 Y:2019 | 08 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $397 | $576 | Implemented |
SU0483 # 09 Y:2019 | 09 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,136 | $5,186 | Implemented |
SU0483 # 10 Y:2019 | 10 | 2019 | USE PHOTOCELL CONTROLS | $256 | $460 | Implemented |
SU0483 # 11 Y:2019 | 11 | 2019 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $110 | $357 | Not Implemented |
SU0483 # 12 Y:2019 | 12 | 2019 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $48 | $163 | Not Implemented |
UF0533 # 01 Y:2019 | 01 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $53,828 | $109,400 | Implemented |
UF0533 # 02 Y:2019 | 02 | 2019 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $42,877 | $213,770 | Implemented |
UF0533 # 03 Y:2019 | 03 | 2019 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $20,145 | $54,910 | Implemented |
UF0533 # 04 Y:2019 | 04 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,617 | $472 | Implemented |
UF0533 # 05 Y:2019 | 05 | 2019 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $1,160 | $4,000 | Implemented |
UF0533 # 06 Y:2019 | 06 | 2019 | RECOVER AND REUSE WASTE MATERIAL | $396,790 | $810,000 | Implemented |