IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

852

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0163 # 03 Y:2016 03 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,160 $7,000 Not Implemented
DL0163 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,110 $55,940 Implemented
DL0163 # 01 Y:2016 01 2016 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $30,630 $2,700 Implemented
DL0161 # 07 Y:2016 07 2016 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $40,210 $390,000 Not Implemented
DL0161 # 06 Y:2016 06 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,450 $21,270 Implemented
DL0161 # 05 Y:2016 05 2016 Install Anaerobic Digester $990,000 $6,000,000 Not Implemented
DL0161 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,215 $58,570 Implemented
DL0161 # 03 Y:2016 03 2016 USE EXISTING DAM TO GENERATE ELECTRICITY $6,400 $28,700 Not Implemented
DL0161 # 02 Y:2016 02 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $144,770 $285,230 Not Implemented
DL0161 # 01 Y:2016 01 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $9,700 $6,000 Not Implemented
DL0156 # 07 Y:2015 07 2015 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $19,680 $217,600 Not Implemented
DL0156 # 06 Y:2015 06 2015 RECOVER MECHANICAL ENERGY $7,880 $20,000 Not Implemented
DL0156 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,590 $2,950 Implemented
DL0156 # 04 Y:2015 04 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,140 $3,000 Not Implemented
DL0156 # 03 Y:2015 03 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,350 $3,000 Not Implemented
DL0156 # 02 Y:2015 02 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $42,210 $37,500 Implemented
DL0156 # 01 Y:2015 01 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,830 $940 Not Implemented
DL0151 # 08 Y:2015 08 2015 MINIMIZE WATER USAGE $80,640 $200,250 Not Implemented
DL0151 # 07 Y:2015 07 2015 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $1,970 $4,480 Not Implemented
DL0151 # 06 Y:2015 06 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,550 $14,400 Not Implemented
DL0151 # 05 Y:2015 05 2015 UPGRADE CONTROLS ON COMPRESSORS $7,730 $11,520 Not Implemented
DL0151 # 04 Y:2015 04 2015 OPERATE BOILERS ON HIGH FIRE SETTING $10,860 $4,610 Not Implemented
DL0151 # 03 Y:2015 03 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $60,250 $20,000 Not Implemented
DL0151 # 02 Y:2015 02 2015 MINIMIZE OVERFLOWS BY INSTALLING LEVEL CONTROLS $37,680 $12,400 Not Implemented
DL0151 # 01 Y:2015 01 2015 USE CORRECT SIZE STEAM TRAPS $12,870 $2,380 Not Implemented