Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,317
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0658 # 02 Y:2024 | 02 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $20,234 | $90,000 | Not Implemented |
WV0658 # 03 Y:2024 | 03 | 2024 | INSULATE BARE EQUIPMENT | $12,543 | $934 | Implemented |
WV0658 # 04 Y:2024 | 04 | 2024 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $12,305 | $1,500 | Implemented |
WV0658 # 05 Y:2024 | 05 | 2024 | DEVELOP A REPAIR/REPLACE POLICY | $10,700 | $3,650 | Implemented |
WV0658 # 06 Y:2024 | 06 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,787 | $900 | Implemented |
WV0658 # 07 Y:2024 | 07 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,056 | $7,004 | Implemented |
WV0658 # 08 Y:2024 | 08 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,674 | $10,167 | Not Implemented |
WV0658 # 09 Y:2024 | 09 | 2024 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,325 | $952 | Implemented |
WV0657 # 01 Y:2024 | 01 | 2024 | REPLACE BOILER | $38,907 | $149,240 | Not Implemented |
WV0657 # 02 Y:2024 | 02 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $21,406 | $98,076 | Not Implemented |
WV0657 # 03 Y:2024 | 03 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,019 | $3,647 | Implemented |
WV0657 # 04 Y:2024 | 04 | 2024 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $5,370 | $18,750 | Not Implemented |
WV0657 # 05 Y:2024 | 05 | 2024 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $4,482 | $1,500 | Implemented |
WV0657 # 06 Y:2024 | 06 | 2024 | INSULATE BARE EQUIPMENT | $2,493 | $1,302 | Implemented |
WV0657 # 07 Y:2024 | 07 | 2024 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,266 | $1,107 | Implemented |
WV0657 # 08 Y:2024 | 08 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,181 | $1,063 | Implemented |
WV0657 # 09 Y:2024 | 09 | 2024 | DEVELOP A REPAIR/REPLACE POLICY | $1,429 | $6,850 | Implemented |
WV0657 # 10 Y:2024 | 10 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $486 | $242 | Implemented |
WV0656 # 01 Y:2023 | 01 | 2023 | USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS | $114,700 | $500,000 | Not Implemented |
WV0656 # 02 Y:2023 | 02 | 2023 | USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) | $17,471 | $75,000 | Not Implemented |
WV0656 # 03 Y:2023 | 03 | 2023 | INSULATE BARE EQUIPMENT | $8,319 | $1,861 | Implemented |
WV0656 # 04 Y:2023 | 04 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,117 | $9,888 | Implemented |
WV0656 # 05 Y:2023 | 05 | 2023 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $4,882 | $17,230 | Not Implemented |
WV0656 # 06 Y:2023 | 06 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $3,448 | $14,655 | Not Implemented |
WV0656 # 07 Y:2023 | 07 | 2023 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $2,997 | $1,500 | Implemented |